Page 79 - CRS Engineering
P. 79

Proforma for Joint Inspection on R. A. T.
                                                  For the Year 2020 -21
             SI                    Description                                         Remarks
             No
              I   General Particulars of RAT
              1   Name of the tank                                Reddy Palli Tank
              2   District                                       Chittoor District
              3   Name of the Village and Mandal                 Reddy Palli Village, Srikalahasti Mandal
             4    Latitude & Longitude
                 Affected Railway Bridge and Km                  The Tank Lies in-between Bridge No        55 & 50 /
             5
                                                                 6 -  R
             6    Railway section in between stations            Yellakaru
                  Distance from Railway Bridge to weir           0.50 KMs from the Railway Line to the tank.
             —j
             7
                 ( Along the Course of Nallah )
             II  Standard Hydraulic Details
             1   Catchment Area                                  1.58 Sq miles
                 Capacity of the tank                            29.27 MCFT
             2
                 Lowest Bed Level                                +46.40M
             3
             4   Full Tank Level ( F.T.L )                       +50.00M
                 Maxim Water Level ( M.W.L )                     +50.60M
             5
                 Danger Level ( D.L )                            +51.20M
             6
                 Top of Bund Level ( T.B.L )                     +51.50M
             7
                 Top Width of the Bund                            2.50 M ( PRESENT TOP WIDTH )
             8
                 Side Slopes                                     AT FRONT:- 1 Vz : 1 , AT REAR       2:1
             9
            10   Area of Submergence at FTL                                                -
                 Area of Submergence at MWL                                                -
            11
            12 Are there any tanks in the Catchment of                                    NO
            13 Are these tanks also classified as RATs                                     -

            14   Names and details of these tanks                                          -
            III  Surplus Weir                                                              -
             1   Number of Surplus Weirs                         TWO NUMBERS ONLY ( 2 Nos Only )
             2   Lengths of Surplus Weir
                 Type of Surplus Weir                            B.C WEIR
             3
                 Design Discharge                                670.00 CUSECS
             4
            IV   Sluices
                 Number of Sluices                              TWO NUMBERS ONLY ( 2 Nos Only )
             1
             2   Location of Sluices
                 Maximum designed discharge                      2.50 CUSECS
             3
                 Functional or not                               Repairs
            4
                A) Inspection details
            V
                 i)Date of Inspection                                             SX- ox           :                —
                 i)Name& Designation ofthe Inspection
          -—                                                                  1) Sri. C. Willson Babu,              ~
                                                                           Assistant Divisional Engineer .
          •—
                                                                               South Central Railway
                                                                                     RENIGUNTA
                                                                     2) Sri. C.Adinarayana Naidu, B.Tech.,
                                                                            Deputy Executive Engineer .
                                                                               Irrigation Sub Division
                                                                                   SRIKALAHASTI
                                                                             3) Sri. K Rajesh,B.Tech.,
                                                                           Assistant Executive Engineer ,
                                                                                  Irrigation Section
                                                                                   SRIKALAHASTI

                 i) If tank auality for classification as RAT
          '—                                                                            YES
   74   75   76   77   78   79   80   81   82   83   84