Page 84 - CRS Engineering
P. 84
Si Description Remarks
No
iii) If tank quality for classification as RAT YES
B) Tank Bund
i) Is the top level of the bund uniform and YES -
as oer the standards?
ii) Is the top width of the bund as per YES -
standards?
iii) Are the slopes as per the standards? YES -
iv) Any dangerous gullies or scour of the - NO -
bund?
C) Surplus Weir
i) Condition Yes
ii) Is the Length adequate for Design
discharae?
iii) Is Danger Level marked Yes
D) Condition of the Sluices Yes
E) Any Past history of Breach of the
tank if so, details.
V B) iv) This Tank is Repaired Under Somasila -
Swarnamukhi Link Channel System.
Assistan ecutive Engineer, Deputf^xfecirave Engineer,
Irrigation Section, Irrigation Sub-Division,
SRIKALAHASTI.
SRIKALAHASTI.
Assistant Divisional Engineer,
South Central Railway,
RENIGUNTA.