Page 80 - CRS Engineering
P. 80
SI Description Remarks
No
B) Tank Bund
i) Is the top level of the bund uniform and - NO -
39 ner the standards?
ii) Is the top width of the bund as per - NO -
standards?
iii) Are the slopes as per the standards? - NO -
iv) Any dangerous gullies or scour of the YES -
hiind?
C) Surplus Weir
i) Condition YES -
ii) Is the Length adequate for Design YES -
Hisrharae?
iii) Is Danger Level marked Yes
Yes
D) Condition of the Sluices
E) Any Past history of Breach of the Near Sluice, it was restored
tank if details.
\p/io
Assistant tx^fetitlv^ ineer, Deputf^>fec<3fiVe Engineer,
Irrigation Section, Irrigation Sub-Division,
SRIKAi-AHASTI. SRIKALAHASTI.
-kAj,
Assistant Divisional Engineer,
South Central Railway,
RENIGUNTA.