Page 179 - Mines Facilities Plan
P. 179

173
                                                                                                      church and a Queen Anne mansion. Parking would be adjacent in Lot N and

                                                                                               Montgomery College Cultural Arts Center (SmithGroup), Takoma Park, MD









                                                                                                         nearby in the Washington Street parking structure.






                                                                                                                      The Plan



















                                                            South Campus is redeveloped, the HASS Music and Performing Arts facilities
                                                   facilities all over campus. Because music and arts are natural creative outlets
                                                                         campus locations for a consolidated music and performing arts facility. Mines
                                                                              Arts programming would benefit from proximity to the Green Center and the
                                                 The music and performing arts programs are currently housed in makeshift
                                                      for engineering and science students, these programs should be relocated
                                                                            should construct an approximately 26,500 GSF, two-story facility on Lot O.
                                                                      SmithGroup prepared a detail programming study that considered multiple
                                                         to a more centralized location to make them collectively stronger. Before











                                                                                   existing Bunker Auditorium and Friedhoff Hall. Approximately 12,000 NSF of  the program could partially be located in the Green Center basement level if   Enabled projects: After the HASS Music and Performing Arts facilities and  Central Receiving are relocated, the South Campus Neighborhood can be  The facility should front 15th Street, and its scale and site layout should  complement the adjacent Foot


                                                               located there should be relocated.  Geophysics moves out of Green Center.   Necessary precedent projects: None







                                          ARTS CENTER  THE NEED    THE PROJECT                      redeveloped.  THE SITE
   174   175   176   177   178   179   180   181   182   183   184