Page 400 - Mines Facilities Plan
P. 400
Parking Structure 1 (Maple/14th) Run new direct buried 4” CHS/CHR lines to Mines Run new direct buried 14” CHS/CHR lines to serve the new Frontiers Building. Run new direct buried 5” CHS/CHR lines south to Residence Hall VI (Part of Campus Infrastructure Run new direct buried 4” CHS/CHR lines to Weaver Towers (Part of Campus Infrastructure Upgrade Provide new 200 Ton Chiller to replace existing 1998 York (YSCACAS2-CFDS) Chiller. Alternate: Facilities
SUMMARY OF CHILLER PLANT REQUIRED UPGRADES
REMARKS Upgrade Project). Project). alone. Recreation Facility. Note: The years listed in this chart are based on the year buildings are anticipated to start design and
REQUIRED UPGRADES New Chilled Water Line Infrastructure New Chilled Water Line Infrastructure Replace Chiller New Chilled Water Line Infrastructure (3) New Heat Exchangers and Control Valves New Chilled Water Line Infrastructure to Complete Loop New Chiller Plant therefore the actual work may be performed in subsequent years.
CHILLER PLANT CP4 CP6 CP4 CP6 CP6 CP6 and CP7 CP6, CP7 and CP8
YEAR 2019 2019 2020 2020 2021 2023 2030
CHILLED WATER Mines has four (4) existing chilled water plants located throughout the campus. Chiller upgrades and replacements are required in order to accommodate the addition of the buildings within this master plan. Chiller Plant 4 (CP4) has an older chiller that will need to be replaced soon. Similarly, CP5 has a chiller that is not operational and should be replaced for redundancy, back up, and future connections if desired. Additionally, CP5 and CP6 requ