Page 46 - STARTER KIT SHIFT ENGINEER 2017v
P. 46
STARTER KIT | Shift Engineer
Task 15: Commissioning and quality checking accomplished JOR.
STEP(S) STANDARD(S)
1. After JOR completed commissioned or checked the No incidence of accomplished JOR are not checked and
quality of worked. commissioned.
2. Assess and make evaluation. No incidence of back job on accomplished JOR.
3. Report recommendation to Housekeeping and Front
Office Department.
Task 16: Reading of water and power consumption
STEP(S) STANDARD(S)
1. 12mn- Get the meter reading of water and power. Power and water cost daily are recorded daily.
2. Record all reading in daily cost monitoring of power
and water.
3. Report to Hotel Engineer all unusual reading for the
day.
4. Report all usual incidents in power and water
concern (if any).
Task 17: Handle of engineering tool and equipment.
STEP(S) STANDARD(S)
1. Daily checking of engineering tools/equipment. All equipment and tools are properly working and secured.
2. If defective, repair or send to repair shop for All defective equipment are forward to repair shop for
assessment. assessment.
3. Regular monitoring during repair.
4. After duty time, clean all tools according
recommended chemicals.
5. Stored tools and equipment on secured cabinet or
storage/s
41