               Project Approach



               Project Understanding                              Project Team

               The project consists of a front-loaded warehouse   At Bernardon, we believe that teamwork and partnering
               building  of  approximately  342,000  square  feet  to  be   are the key elements to making a project truly successful
               located at 104 Guilford College Road in Greensboro,   with respect to not only the final product, but also
               North Carolina.  The clear height will be 36 feet as   the design and construction process.  We believe in a
               measured at the speed bay side of the first column line.    collaborative approach to design, where the Owner and
               Preferred column spacing of the dock bays has been   other interested parties participate in the design process
               communicated as being 60 feet deep by 50 to 54 feet   to ensure the project’s ultimate success.
               wide.  Preferred column spacing of the interior bays
               has been communicated as being 50 feet deep by 50 to   We will retain  MacIntosh Engineering to provide
               54 feet wide.  The building will include two (2) primary   structural engineering services, and we have incorporated
               building entrance expressions at two corners of the   their fee and services in this proposal.  We have assumed
               warehouse.  Interior improvements will be limited to an   that conventional spread footings are adequate to support
               electrical room and sprinkler room.  The building will   the building loads.  We recommend that you engage a
               have conventional spread footings, insulated precast   geotechnical consultant to confirm the soil bearing and
               concrete, non-loadbearing wall panels, and conventional   underlying conditions, recommended foundation system,
               steel frame.  The roof will be a 60-mil TPO membrane   and seismic site coefficient prior to the structural system
               on rigid insulation on metal deck.  Other characteristics   design.
               of the building systems incorporated in this proposal   We will retain  Paragon Engineering Services to
               have been identified in the document titled “Outline   provide the scope of mechanical, plumbing, electrical,
               Specifications for 104 Guilford College Road” that was   and fire protection (MPEFP) engineering design services.
               included as part of the Request for Proposal (RFP).
                                                                  Fire suppression scope of work will be described using
                                                                  a  performance-based  narrative.   We  understand that
               This proposal is for the shell building only.  Tenant   utilities to the site including the electrical, gas, water,
               specific fit-out improvements such as office areas,   and sewer capacities will be adequate to support the new
               shipping offices, toilet rooms, battery charging, etc.,   construction.  Civil engineering will be provided by others
               are  not  included.    We  understand  the project  will   under direct contract with you.  We understand the civil
               not  seek  third-party  validation  of  environmentally   engineer will be responsible for site demolition drawings
               responsible initiatives, such as USGBC’s LEED Rating   including the demolition of existing structures on the site.
               System, Energy Star, Green Globes Certification, and   Our design team will coordinate the building’s finished
               Living Building Challenges as part of the Basic Services   floor elevation, mechanical, plumbing, and electrical
               outlined in our proposal.  If this were to change, we   utility ingress/egress elevations and sizes with the civil
               can provide the design and administrative services   engineer.
               associated with certification as Additional Services.
                                                                  We understand Equus Development, L.P. will engage a
               We will provide the pre-construction design services   General Contractor (GC) or Construction Manager (CM).
               within 13 weeks of award in accordance with the    The GC or CM will be responsible for cost estimating
               schedule included as part of the RFP.              during pre-construction, scheduling, and coordination of
                                                                  all construction related activities.



               BERNARDON  |  Response to Request for Proposal for Design Services                          Page 1
               Equus Development, L.P.   |  104 Guilford College Road, Greensboro, NC  |  July 30, 2021
   1   2   3   4   5   6   7   8   9