■ The following shop drawings and submittals Additional Services and Exclusions
will be reviewed:
• Concrete wall panels (architectural We can provide Additional Services at your request
features). if the scope of the project or our services changes
• Miscellaneous metals (roof ladder, railings, for a mutually agreed upon fixed fee or on an hourly
steps). basis at our standard hourly rates. Examples of
• Aluminum and glass.
• Doors, frames, and hardware. Additional Services would include:
• Dock equipment.
• Roofing. ■ Making Owner-requested revisions to
• Structural components. previously approved drawings.
• Mechanical, plumbing, and electrical ■ Making “value engineering” changes to the
components. drawings after receipt of bids.
■ Answer contractor Requests for Information ■ Preparing an artist’s rendering of the building.
(RFIs). We have included a budget of fifty (50) ■ Preparing book-format specifications.
hours for this service. ■ Making additional site visits or answering
RFIs during construction beyond the scope
Please note that it is our goal to maintain flexibility listed above.
in the performance of our services during this ■ Reviewing submittals not listed above.
phase and render the most appropriate level of ■ Preparing documentation for tenant fit-out or
service. We can modify our scope of services upon other interior improvements.
your request with an adjustment in compensation. ■ Project closeout services including but not
limited to record drawings and as-built
documentation.
Compensation ■ Providing services after a substantial delay in
the project schedule.
Basic Services
We propose to perform the Basic Services The following are not included in our scope:
described above for a lump sum fixed fee in
accordance with the compensation schedule ■ Geotechnical (soils) engineering.
included herein as Exhibit A – Design RFP Cost ■ Civil engineering and landscape architecture.
Breakdown. Hourly rates are included in Exhibit ■ Mechanical, plumbing, and electrical
B – Hourly Rate Schedule. engineering.
■ Fire suppression (sprinkler) final design.
Reimbursable Expenses ■ Construction cost estimating.
Reimbursable expenses (such as printing,
overnight delivery, air travel, mileage, meals,
overnight accommodations, etc.) are not included
in the above professional fees and will be invoiced
based upon actual costs expended times 1.10.