                  ■ Recommend the use of rapidly renewable resources.  7.  3 loading dock bays, 2 load levelers and receiving area
                  ■ Endeavor to specify materials that incorporate recycled   8.  Flammable storage area (300 SF with separate
                  content.                                             suppression)
                                                                   9.  Bio waste and media prep process area (autoclave
               Whether pursuing LEED certification or not, sustainability,   processing area) (250 SF)
               good design and cost-effective practices will always   10.  Approx. 9,000 SF of bio and 12,000 SF of chem lab
               be  considered  and  reviewed  so  that  the  best  and  most   space (total 2,000SF).
               economical solutions are achieved.                  11.  1,000 SF open space for process
                                                                   12.  Office approx. 15,000 SF of mixed private, cube, and
                                                                       open office. 2,000-3,000 SF of mixed-use conference
               Project Approach                                        rooms.
                                                                   13.  C-Suite – approx. 3,000-4,000 SF
               Project Understanding
               Our team has reviewed the scope of services outlined in   The project will also include full mechanical (including
               the  Request  for  Proposal,  and  we  believe  that  we  have   substation) design in support of a mixed bio/chem laboratory
               assembled a stellar team to provide architecture, interior   facility. Mechanicals to include fan loft (strobics), generator,
               design, and MEPFP design services for Project Pegisis.  We   UPS for analytical and sensitive equipment (minimal run
               understand JLL - PDS is seeking to provide tenant fit-out of   time).  Liq N2 and CO2 external tanks, RO (pharma grade
               approximately 80,000 SF of space in an existing building for   water)  to all labs, pressurized/dried air,  tempered water
               a life sciences tenant.  The space will consist of a vivarium,   system, all new utilities. Standard access control system
               chemistry sysnesis lab, biology lab, analytical labs, small   for  each  lab/facility.    External  and  controlled  90  waste
               process facility and office spaces.                 accumulation (Class 1A with ventilation and grounding for
                                                                   drum pour off)
               The project program will consist of the following space and
               function breakdown:                                 The Bernardon team will provide full architectural;
                                                                   mechanical, electrical, plumbing, and fire protection
               1.  Vivarium 2,000-3,000 SF with redundant HVAC and   (MEPFP); laboratory planning; and interior design services.
                   generator backup in which half will be defined as a   Structural engineering services will be provided as required
                   barrier  facility  (1,000  SF).  Will  include  2-3  animal   to support the project needs.
                   rooms, 3 procedure rooms and storage. Tunnel and
                   cage washer capability for ventilated racks. Common   We understand that existing base building drawings will
                   equipment area.                                 be provided to our team in electronic CAD format.  Base
               2.  Core Analytical service labs                    building plans provided by others shall accurately depict the
                   a.  Nmr – space for 2 (only single magnet at    building’s core and shell.
                       first) 600 MHz with Cyroprobe
                   b.  LC Mass spec facility                       In addition to the expertise of Zimmerman and DEDC
                   c.  HPLC (some core, some in small walk-up      designing research and lab spaces, Bernardon has significant
                       rooms near labs)                            experience creating spaces where companies can create a
               3.  Lyophilizer facility (500 SF)                   collaborative work environment.  We design laboratory
               4.  Freezer Farm (ULT, -20 deg) on emergency power  spaces, along with flex offices and shared workspaces, that
               5.  Storage – min 1,500 SF of storage               increase productivity and encourage collaboration. Our
               6.  Service corridor to connect all lab facilities.  designs focus on efficiency, safety, and employee health that
                                                                   improves the quality of the work environment and enhances
                                                                   the client’s investment.




            BERNARDON | Response to Request for Proposal for Architectural and Engineering Services
            JLL - PDS | Project Pegisis | July 20, 2021                                                    Page 2
   1   2   3   4   5   6   7   8