Page 5 - Bernardon Response to RFP-Project Pegisis
P. 5

www.bernardon.com







                acoustic separation. This can be  exceptionally  difficult     selection of consulting engineers who not only are specialists
                for multipurpose spaces to function optimally while   in their particular fields, but also share Bernardon’s core
                maintaining flexibility.                           values:

                The Bernardon team understands that  contamination     ■ To provide the highest level of client service in a team
                control  and   maintaining   clean  and   sterile      atmosphere based upon communication, cooperation
                environments are  critical components  to the design   and collaboration;
                of this facility.  Our team has solid experience with clean     ■ To develop designs that  reflect the values and
                rooms for research and production which often include   mission of our clients;
                vestibules or anterooms with differential pressurization and     ■ To provide options to our clients via a very interactive
                filtration for separation of environments.  In addition, we   approach that explores multiple design solutions;
                are familiar with facilities for autoclaves, cage washers, and     ■ To design facilities that promote a sense of community
                tunnel washers which require comprehensive separation for   and wellness in a comfortable environment that
                clean and dirty function areas. We are also experienced with   maximizes access to the outside environment;
                interior finishes and detailing to avoid collection of dust,     ■ To  incorporate sustainability in our design when
                facilitate easy  cleaning, and  withstand  various  cleaning   possible; and
                agent reactions.   All of these considerations require close     ■ To recognize at all times the importance of project
                coordination  with  the  Owner  and  Tenant’s personnel,   cost and schedule.
                equipment and processes.
                                                                   We have invited  Zimmerman  Studio  LLC  to join as
                Approach to schedule and cost  control.            Laboratory Specialists offering their expertise with
                Bernardon understands JLL and the building user’s stated   technically-demanding  projects and  extensive experience
                desire to commence project construction quickly to achieve   in  the  design  and  documentation  of  clinical  and  research
                occupancy on August 15, 2022. This will not happen at   laboratories.  Based on our current collaboration with
                the expense of quality construction documentation. The   Zimmerman Studio for the  Laboratory Expansion for
                Bernardon Team will focus on the total process of project   the Delaware Division of Public Health in Smyrna, DE
                delivery which directly involves cost, building system   and the recent Testing Lab Addition for Aqua America
                performance, construction technology, and schedule.   in Bryn Mawr, PA, we feel Zimmerman Studio will be an
                This is accomplished through our ongoing Quality Assurance   invaluable asset to the team.  They bring many strengths to
                program, which is designed to build high quality into the   this project, including the ability to collaboratively work with
                project documentation at each stage of design, which also   clients with complex program requirements, expertise with
                allows the project to be checked at each phase against an   technically  demanding  projects,  and  extensive  experience
                established cost model. This, in turn, allows for any needed   in  the  design  and  documentation  of  clinical  and  research
                course correction prior to the project being issued for bid   laboratories.
                and decreases the potential for change orders.
                                                                   Recently, Zimmerman completed the renovation of the
                Design Team                                        Chemistry 1973 Wing, which is part of the Chemistry
                Bernardon believes that teamwork and partnering are the   Complex at the University of Pennsylvania in Philadelphia,
                best ways to make a project truly successful - not only with   PA.  This renovation was designed to support the research
                respect to the final product, but also in making the process   of a new faculty member and an Emeritus faculty member
                one in which all members of the design and construction   to support their work at the intersection of inorganic
                team have a positive experience that draws upon the unique   chemistry, biochemistry, and microbiology. The laboratory
                talents of each team member.                       consists of a large space with (6) fume hoods, island benches,
                                                                   and a Mass Spec area. A specialty equipment room with a
                Bernardon’s  strategy  to  provide  JLL  -  PDS  with truly   bio-safety cabinet and anaerobic chamber is also included,
                remarkable design solutions and service is reinforced by our   with a student work room nearby.


            BERNARDON | Response to Request for Proposal for Architectural and Engineering Services
            JLL - PDS | Project Pegisis | July 20, 2021                                                    Page 4
   1   2   3   4   5   6   7   8   9   10