                  ■ Making revisions to previously approved drawings;  Terms and Conditions
                  ■ Marketing materials;                           We can begin performing our services upon receipt of
                  ■ Providing services after a substantial delay in the   written authorization to proceed.  Additional Terms
                  project schedule;                                and Conditions and a sample copy of our certificate of
                  ■ Assisting with value engineering after the delivery of   insurance which  outlines  our  Insurance  Coverage are
                  construction documents;                          included as part of the Appendix to this submissions
                  ■ Additional meetings and/or construction inspections
                  beyond those outlined herein; and                Prior/Pending Litigation
                  ■ Additional renderings beyond those outlined herein.  Currently, Bernardon is involved in two legal matters. The
                                                                   first involves a file claimed by Bernardon against a senior
               The following are excluded from our scope of services:  living developer who failed to pay Bernardon for contracted
                                                                   services. This matter is currently pending a bankruptcy
                  ■ Base building documentation of core and shell;   claim by the defendant. The second involves the neighbor
                  ■ Civil and Geotechnical Engineering;            of an apartment building for which Bernardon served as
                  ■ Construction cost estimating;                  the Architect. They are stating that the new apartment
                  ■ Interior and exterior signage other than signage   building has adversely affected their building. Bernardon
                  required by code;                                was not served with a Second Amended Complaint, so
                  ■ Building envelope consulting;                  we expect the matter to be abandoned in the immediate
                  ■ Acoustical design services; and                future.
                  ■ LEED design and accreditation.

               This proposal makes the following Assumptions:
                                                                   Organization and Staffing
                  ■ Specialized equipment (NMR, lyophilization, mass spec
                  etc.) to be provided to the design team. This information
                  is needed in the schematic design phase of the project.  Communication, Collaboration, Cooperation
                  ■ Laboratory gas generation and storage systems to be
                  designed by others. Design team lab gas design shall   The people of Bernardon are impassioned listeners,
                  include piping to laboratory users.              lifelong innovators, and imaginative design leaders.
                  ■ Client/tenant to provide laboratory design criteria   We continue to provide informed design solutions
                  including equipment load data as well as temperature,   that respond to the design goals of our clients, and we
                  exhaust, and humidity requirements to the design team.  elevate the lives, productivity, and comfort of the users of
                  ■ If required owner to provide electrician to assist in   those design solutions through a process of listening,
                  existing circuit tracing to verify availability of electrical   understanding,  researching,  synthesizing,  and
                  feeds to be used for this project.               implementing.
                  ■ Owner to provide building hazard classification and flow
                  test information for fire protection system specification   As Principal-in-Charge,  Neil  B.  Liebman,  AIA,  LEED
                  during the schematic design phase.               AP, will serve as the main point of contact for the
                  ■ Design of specialty communications (AV and security)   management of this project with JLL - PDS, and the
                  will be provided by others. Design team  drawings will   services provided by the entire Bernardon team. He will
                  include locations for outlet box and raceways.   ultimately be responsible for design and technical quality,
                  ■ Record drawings will be developed based on red lines by   the allocation of firm resources, and for client satisfaction.
                  construction contractor.








            BERNARDON | Response to Request for Proposal for Architectural and Engineering Services
            JLL - PDS | Project Pegisis | July 20, 2021                                                    Page 8