Page 8 - Bernardon Response to RFP-Project Pegisis
P. 8

www.bernardon.com







               Phase IV – Construction Documents                      ■ Coordination of drawings and specifications with the
               The decisions made during Design Development phase     design team consultants; and
               shall form the basis for proceeding with production of the     ■ Technical specifications (book-format).
               Construction Documents..  We will assist in submitting
               documents to state agencies and local jurisdictions for   Phase VI – Bidding
               building permit procurement. We will prepare complete   Our role during the bidding process will include the
               architectural working drawings and specifications that   following:
               describe the requirements of construction work for the
               project.                                               ■ Answering bidders questions via narrative and graphic
                                                                      means;
               Bernardon has a well-established reputation            ■ Preparing and issuing Addenda, as required; and
               for technical production and is recognized by          ■ Assist with bid evaluations, negotiations, and award of
               consultants and contractors for the professional       contracts.
               quality of our construction documents. Our attention
               to detail will ensure that the contractors have accurately   Phase V – Construction Administration
               captured all aspects of the project in their bids.  Our   During construction, our scope of services can vary
               extensive  experience  working  with  governing  agencies   depending upon the involvement of the Owner and the
               and authorities having jurisdiction throughout the region   construction delivery process.  For the purposes of this
               makes us acutely sensitive to maintaining project schedules   proposal, we have assumed a role including the following:
               through the process.
                                                                      ■ Attend a pre-construction meeting;
               We will prepare the following documents suitable for final     ■ Review owners construction schedule and consult with
               bidding, permitting, and construction:                 team on goals, milestones and deadlines;
                                                                      ■ Answer requests for information (RFIs) via written or
                  ■ Project coversheet and drawings list;             graphic means;
                  ■ Code summary, code plans and details;             ■ Review shop drawings and submittals;
                  ■ Exterior wall and interior partition types;       ■ Review Contractor Applications for Payment;
                  ■ Architectural floor plans at 1/8” scale for each floor     ■ Review proposed change orders and assist in processing
                  level;                                              them for approval.
                  ■ Enlarged plans for specialty areas;               ■ Attend biweekly on-site meetings, observe progress and
                  ■ Ceiling Plans;                                    report on compliance of work with contract documents;
                  ■ Wall sections and details;                        ■ Coordinate consultants through the construction
                  ■ Schedule for doors and hardware;                  process;
                  ■ Interior design plans, elevations and schedules;    ■ Perform a punch list review; and
                  ■ Furniture plans of office, common and specialty areas     ■ Assist project team in securing Certificate of Occupancy.
                  for coordination with the furniture vendors. Provide
                  electronic files to vendors;                     We anticipate a six (6) month construction period.  We have
                  ■ Structural engineering drawings and associated details;  included visits to review the project at critical points during
                  ■ MEPFP plans, diagrams, schedules, and details   the construction process.
                  including plumbing, HVAC, electrical service, power
                  and lighting, and a performance specification for fire   Additional Services, Exclusions, Assumptions
                  suppression;                                     Our services are limited to the Scope of Services described
                  ■ All site utilities will be designed and detailed by the   above.  If the scopes of the project or our services change,
                  Civil Engineer.  The MEPFP Engineer will review and   we reserve the right to invoice for Additional Services.
                  coordinate the site utilities;                   Examples would include:




            BERNARDON | Response to Request for Proposal for Architectural and Engineering Services
            JLL - PDS | Project Pegisis | July 20, 2021                                                    Page 7
   3   4   5   6   7   8   9   10   11   12   13