                 Phase II – Conceptual Site Plan                        ■ The  illustrative site plan  will  depict  an
                                                                        overall urban and streetscape plan and
                    ■ Landmark will provide a written report            parking layout for Phase I which will
                    outlining the requirements of the New               include conceptual hardscape patterns
                    Castle County (NCC) Unified Development             and conceptual locations of street trees,
                    Code (UDC) as it relates to the Master              street lights, bollards, benches, bike racks,
                    Plan.                                               and related streetscape elements.
                    ■ Review both existing and proposed                 ■ The illustrative site plan will be fully
                    pedestrian and vehicular connections                rendered in color and appropriate for
                    for the campus including evaluation and             public presentations and marketing
                    efficiency of parking areas that meet the           purposes.
                    UDC requirements and the individual                 ■ Landmark will provide a written report
                    building uses.                                      outlining the requirements of the NCC
                    ■ DEDC will develop MEP master planning             UDC as it relates to the Master Plan.
                    options to review with the project team.            ■ Landmark will prepare a written report
                    ■ Bernardon will develop up to three (3)            identifying domestic water, fire protection
                    conceptual diagrams depicting general               water, sanitary sewer, storm water systems
                    circulation patterns, various uses, density         and stormwater management facilities,
                    ranges, target square footages, and                 and those utilities and facilities that will
                    relationships between uses.                         serve both the proposed campus and the
                    ■ Meet with MRA to review conceptual                existing owner property to the north.
                    diagrams and select a preferred diagram             ■ DEDC will develop a report showing
                    option.                                             both current and future MEP utility
                    ■ Revise selected conceptual diagram based          requirements including:
                    on MRA comments.                                      •  Power
                    ■ Three (3) meetings with MRA to review               •  Emergency Power
                    and revise design concepts.                           •  Natural Gas
                                                                          •  Water and Sewer
                                                                          •  Cooling
                 Phase III – Illustrative Site Plan and                   •  Heating
                 Engineering Deliverables                               ■ Two (2) meetings with MRA to review and
                                                                        revise design concepts.
                    ■ During the illustrative site plan phase,
                    Bernardon  will  integrate  the  conceptual
                    site plan with the conceptual architectural
                    design to create a dimensionally stable site
                    plan which can be used as the basis for the
                    civil engineer to prepare land development
                    plans.