Page 46 - Bernardon Response to RFP-Chestnut Run Campus Master Plan
P. 46
www.bernardon.com
Phase II – Conceptual Site Plan ■ The illustrative site plan will depict an
overall urban and streetscape plan and
■ Landmark will provide a written report parking layout for Phase I which will
outlining the requirements of the New include conceptual hardscape patterns
Castle County (NCC) Unified Development and conceptual locations of street trees,
Code (UDC) as it relates to the Master street lights, bollards, benches, bike racks,
Plan. and related streetscape elements.
■ Review both existing and proposed ■ The illustrative site plan will be fully
pedestrian and vehicular connections rendered in color and appropriate for
for the campus including evaluation and public presentations and marketing
efficiency of parking areas that meet the purposes.
UDC requirements and the individual ■ Landmark will provide a written report
building uses. outlining the requirements of the NCC
■ DEDC will develop MEP master planning UDC as it relates to the Master Plan.
options to review with the project team. ■ Landmark will prepare a written report
■ Bernardon will develop up to three (3) identifying domestic water, fire protection
conceptual diagrams depicting general water, sanitary sewer, storm water systems
circulation patterns, various uses, density and stormwater management facilities,
ranges, target square footages, and and those utilities and facilities that will
relationships between uses. serve both the proposed campus and the
■ Meet with MRA to review conceptual existing owner property to the north.
diagrams and select a preferred diagram ■ DEDC will develop a report showing
option. both current and future MEP utility
■ Revise selected conceptual diagram based requirements including:
on MRA comments. • Power
■ Three (3) meetings with MRA to review • Emergency Power
and revise design concepts. • Natural Gas
• Water and Sewer
• Cooling
Phase III – Illustrative Site Plan and • Heating
Engineering Deliverables ■ Two (2) meetings with MRA to review and
revise design concepts.
■ During the illustrative site plan phase,
Bernardon will integrate the conceptual
site plan with the conceptual architectural
design to create a dimensionally stable site
plan which can be used as the basis for the
civil engineer to prepare land development
plans.
BERNARDON | Response to Request for Proposals | MRA Group
Chestnut Run Innovation & Science Park | Campus Concept Master Plan | June 14, 2021 Page 40