Page 112 - Bernardon Proposal for Design Services Revised
        P. 112
     revised Sept. 12, 2022                                                                revised Sept. 12, 2022
                                                                                                            9
              KIMPTON EVERLY HOTEL
              HOLLYWOOD, CALIFORNIA
              ROLE: Structural Engineer                      deck and three-level, above-ground parking garage, which
              CLIENT: Related California                     provides 97 valeted parking stalls.
              CONTRACTOR: Build Group
              TOTAL SQUARE FOOTAGE: 280,000-sf               As the EOR on the project, DCI was tasked with producing
                                                             a design that would withstand any seismic and wind factor.
              HEIGHT: 2 building (5 and 18 stories)
           PROJECT EXPERIENCE  Located in the heart of Hollywood and kiy-corner to the  with concrete column support, as well as lateral support
              CONSTRUCTION TYPE: Concrete, steel, masonry
                                                             They achieved this by using post-tensioned concrete slabs
                                                             through reinforced concrete shear walls.
           xxxx  xxxx  iconic Capitol Records Building, Kimpton Everly Hotel   DCI Engineers, a leader in seismic evaluaons and
              demonstrates forward momentum of southern California
                                                             technology, proved to be the right fi t for the project, due to
              property development. The 16-story, 193,366-sf hotel
              features 210 guest rooms and a luxury penthouse.
              Amenies include a restaurant, cafe, banquet facility, pool  the structure’s high-seismic zone design rang.
                                                            DCI+MACINTOSH ENGINEERS | 320 FRANKLIN AVE TOWER





