ROLE: Structural Engineer four-story ballroom with composite steel floors.
ARCHITECT: Elness Swenson Graham Architects
DEVELOPER: Mortenson Development The DCI engineering team designed the pile system and
CONTRACTOR: Mortenson foundation system; brace frame, gravity system; the
COMPLETION DATE: 2018 concrete lateral shear wall system; and conducted a
NUMBER OF KEYS: 600 dynamic modal response spectrum analysis of the non-
TOTAL SQUARE FOOTAGE: 440,000-sf rectangular shaped tower. The project team provided
HEIGHT: 14 stories construction services support for the client.
COST: $240M
MATERIAL: Steel, Concrete
PROJECT EXPERIENCE xxxx xxxx room hotel now attracting more visitors to the area and
The Hyatt Regency at Oregon Convention Center is a 600-
drawing more national conventions and lifestyle events
to the city. The design-build project was constructed on a
superblock in Portland’s Lloyd District and blends in with
the iconic commercial area. The 440,000-sf Hyatt Regency
has two distinct portions: one part being the 14-story
concrete hotel and another part being a brace framed
DCI+MacINTOSH ENGINEERS | 320 Franklin Ave Tower