Page 105 - Bernardon Proposal for Design Services Revised
P. 105

revised Sept. 12, 2022



                                                                                                              3




               HOLLYWOOD & VINE




               HOLLYWOOD, CALIFORNIA




































              ROLE: Structural Engineer                         columns.  At the roof of the Hotel there is a steel truss that
              OWNER: Legacy Partners Gatehouse Capital          canlevers 52 feet to support a glass enclosed sky bar.



              ARCHITECT: HKS Architects                         There is a steel sky bridge at the 11th floor connecng the
              TOTAL SQUARE FOOTAGE: 1.7M - sf                   Hotel and the Condo. The lateral resisng system for the

              HEIGHT: 14 - Stories                              Condo and Apartments consists of concrete shear walls.


              CONSTRUCTION TYPE: Concrete                       The Hotel ulizes a combinaon of concrete moment
                                                                frames and concrete shear walls. The below grade parking
              DCI Engineers provided structural engineering services   slabs are mild reinforced concrete with drop panels at the

              for this four building project located in Hollywood,   columns.  The foundaon system is primarily a mat slab
              California. The project included a W-Hotel tower, a   with varying thickness.  There are also some pile supported
              condominium tower and two apartment towers.  There is  founda ons adjacent to the MTA subway portal.
           PROJECT EXPERIENCE  xxxx  parking. A poron of the project was designed over the   Hotel Tower – 230,000 SF – 304 units

              retail space at the plaza level and 3 floors of below grade

              entrance to the subway.
                                                                Condominium Tower – 375,000 SF – 144 units
                                                                Apartment Towers – 840,000 SF – 350units
              The gravity framing above grade primarily consists of
                                                                Parking – 550 stalls above grade – 700 stalls below grade
                                                                Total – 1.7 M SF
              post tensioned concrete slabs supported by concrete



                                                             DCI+MACINTOSH ENGINEERS | 320 FRANKLIN AVE TOWER