Page 10 - Magazine - 26-5-2022.cdr
P. 10
HSE STATISTICS - FEBRUARY 2022
Parameter UOM MPW-IND Mouda Rihand Farakka
Site Head Rounds No’s. 12 4 4 4
HSE Kaizen No’s 29 7 14 8
Near Misses (Month / Project) No’s 0/8 0/4 0/4 0/0
Safe Man Hours/ Total Man Hours Hrs 2.78M/5.5M 66K/3.253M 2.33M/2.33M 165K/165K
Safe Man Days / Total Working Days Days 322K/719K 9760/407K 291K/291K 20.6K/20.6K
TCIR/LTIFR/LTISR Vs Million Hrs 0.860/0.860/58 2.276/2.276/153 0/0/0 0/0/0
Incident Details Numbers FAI MI MJ FAI MI MJ FAI MI MJ FAI MI MJ
For the Month 0 0 1 0 0 1 0 0 0 0 0 0
For the Project 8 1 2 4 0 2 2 1 0 2 0 0
Issue Details (UA/UC) Reported Numbers CT MJ MI CT MJ MI CT MJ MI CT MJ MI
For the Month 0 128 315 0 66 186 0 56 89 0 6 40
For the Year 40 1056 1818 1 513 590 36 471 1063 3 72 165
Safety Personnel Available (Include MPW-IND) Numbers R A C R A C R A C R A C
31 27 20 13 8 7 15 9 9 3 2 1
HSE Deviation - Subcon (No.’s) For the Month 7 6 0 1
For the Year 74 51 18 5
Customer (NTPC) Penalties (No.’s) For the Month 1 1 0 0
For the Project 10 9 0 1
Complaint Details (If Any) Mouda – 6 1. Priya – Fire incident at Chimney #4
2. ACIL - Improper scaffolding at gypsum building and ball mill area
3. ACIL – No Qualified safety personnel available ,
4. SEPL – Insufficient scaffolding material and lifelines,
5. Non availability of safety personnel,
6. Penalty of 25K imposed on non availability of safety personnel
Farakka 1. Grim Tech – Site manager and team crossing water-logged area by standing on moving piling rig.
Injury Descriptions (If Any) Major Injury – Mouda -Right Leg Below Knee Bone Fractured struck by falling of steel structural brazing at Steel structural storage
MPW-IND
yard Near Closed storage shed behind MPW-IND Site Office.
HSE STATISTICS - MARCH 2022
Parameter UOM MPW-IND Mouda Rihand Farakka
Site Head Rounds No’s. 12 4 4 4
HSE Kaizen No’s 22 7 6 9
Near Misses (Month / Project) No’s 0/10 1/5 1/5 0/0
Safe Man Hours/ Total Man Hours Hrs 2.81M/6.06M 1.57K/3.41M 2.453M/2.453M 199K/199K
Safe Man Days / Total Working Days Days 352K/758K 21.2K/428K 306K/306K 24.98K/24.98K
TCIR/LTIFR/LTISR Vs Million Hrs 0.777/0.777/64.5 2.062/2.062/171 0/0/0 0/0/0
Incident Details Numbers FAI MI MJ FAI MI MJ FAI MI MJ FAI MI MJ
For the Month 0 0 0 0 0 0 0 0 0 0 0 0
For the Project 8 1 2 4 0 2 2 1 0 2 0 0
Issue Details (UA/UC) Reported Numbers CT MJ MI CT MJ MI CT MJ MI CT MJ MI
For the Month 0 170 372 0 50 178 0 110 154 0 10 40
For the Year 40 1226 2190 1 563 768 36 581 1217 3 82 205
Safety Personnel Available (Include MPW-IND) Numbers R A C R A C R A C R A C
31 27 20 13 8 7 15 9 9 3 2 1
HSE Deviation - Subcon (No.’s) For the Month 3 2 0 1
For the Year 77 53 18 6
Customer (NTPC) Penalties (No.’s) For the Month 0 0 0 0
For the Project 10 9 0 1
Complaint Details (If Any) Mouda -2
1.Priya Construction – Penalty – 25K Hydra Toppling – Not followed the safety instructions and caused an dangerous incident
2 Violation memo – Earth pit not as per standard (GI Pipes & up to 2 meter) - IS:3043 – All four subcontractor
Farakka 1 - 1. Violation memo – Qualified Safety Officer Non availability – M/S. Grim-tech
Injury Descriptions (If Any) No Injury
MPW-IND
8