Page 94 - Regal ideas Binder_USA_v3
P. 94
urbanrail ® Installation Instructions
Gate Installation (Continued)
Lock in pickets. Push bottom TIP: Install all the pickets Snap in spacers into the top Measure 4” from the top of
of picket firmly into bottom you need before installing the and bottom rails. the post and position the top
rail until you feel the picket spacers. of the hinge.
snap into bottom channel.
Next, snap top of picket into
top rail channel.
Measure 4” from the bottom Fasten front of hinges into Fasten side of hinges into Position and fasten the gate
of the post and place the post using URCS50 screws post using URCS50 screws latch pin to the post using
bottom of the lower hinge. (sold separately) (sold separately) USC50 screws.
TIP: Pre-drill using 1/8” TIP: Pre-drill using 1/8”
(3mm) drill bit. (3mm) drill bit.
Secure gate latch pin into Use USC50 screw to fasten Level and secure top hinge Assemble gate latch by
side of post using USC50 bottom lower screws into into post using USC50 connecting appropriate
screws (sold separately) railing end post. screws. connector.
Hinge set comes with post
Warning: Be careful not and wall connector brackets.
to over-torque screws into
aluminum post.
regalideas.com/urbanrail | Toll Free: 1-800-819-4344 | Fax: 1-604-952-4291 | email: sales@regalideas.com 10
V2