Page 14 - 2025 -3 Courier.pub
P. 14
Recap on Speaker Series Development Talk
Mia Winter, Host, Speaker Series
A Lifestyle Program
Did you know? Pleasant Grove widening between Foothills and Woodcreek
th
Roseville is ranked 7 in the US with the happiest residents by Oaks, early 2025, $13 M, 2 lanes to 3 lanes in each direction from
SmartAsset.com 2022 east Foothills Blvd to just west of Woodcreek Oaks Blvd. Roseville
th
One of the best places to live in the U.S. (4 ) by Money Magazine Pkwy. Widening between Galleria and Gibson, phase 1 estimated
th
8 best place to live in America (livability.com) in 2025. Blue Oaks Blvd Road and bridge widening. Design under-
th
27 most livable mid-sized city in the U.S.by Smart Asset.com way.
One of the top 100 safest cities in the U.S. West Roseville Marketplace: Anchor Store: Safeway Grocery
Store, 55,600 SF, in-line shops, 14K sf, pad with drive-through
Roseville’s Assistant City Manager Ryan DeVore, kicked-off the (McDonald’s open), 5500 SF. Gas Station with (16 pumps) to open
2025 Speaker Series presenting “Roseville – A Well-Planned Commu- late Feb. 2025.
nity” to a capacity crowd of 75 in-house and up to 85 on Zoom. His Baseline Marketplace - Costco: 750K SF regional retail; Costco as
talk gave us a high-level view of the City’s Vision, Mission, Goals anchor store (installed $20M in infrastructure), Fuel Station & Car
with tailor-made points on West Roseville development surrounding Wash; $7M+ in annual sales tax (Supports the rest of Sierra Vista), a
our community. Roseville was founded in 1909. The city has a popu- 160K SF Costco warehouse; Open sometime in early 2026.
lation of 155K, a budget of $800M with 1300 employees. It is a full- Phillip Road Site (Pannitoni Developer) - Located at the western end
service city. of Blue Oaks Bl. adjacent to the Creekview Specific Plan. The project
proposes low, medium and high density
MISSION: To provide exceptional ser- residential for a total of 600 dwelling units,
vices in a fiscally responsible manner that 51K SF of commercial buildings. The in-
enhance the quality of life today and in the novation center of the project proposes ap-
future. proximately 1M SF of building area with
GOALS: associated improvements. Project is being
Remain fiscally responsible in a chang- prepared for Planning Approval.
ing world Denio Family Park (Blue Oaks/
Support Community Engagement and Fiddyment) 95-acre park, covered picnic
advocacy area, restrooms, dog park (large and small
Maintain a safe and healthy community dog area), 18-hole Disc Golf Course, natu-
Enhance economic vitality ral areas. Trails to come during phase 2
Deliver exceptional services development. Phase 1 of the park is now
Invest in well-planned infrastructure and open.
growth Placer Valley Soccer Complex, 10 artifi-
cial turf field with cooler materials; 950
According to DeVore, “For the past 35 parking spaces. Shaded pedestrian Spine.
years, Roseville has used a Specific Plan, Permanent field lines for both full-field and
or master planning process, to anticipate and manage growth taking small-sided soccer games; temporary or permanent lines can be added
into account comprehensive long-range planning for municipal ser- for numerous other spots. Under construction.
vices like utilities, traffic, public safety, etc. to ensure the economic
health and availability of city services as the population grows.” Mr. DeVore will be following-up on the status of the large housing
(Roseville.ca.us/DevelopmentDecoded). structure on Pleasant Grove Boulevard adjacent to Eskaton Senior Liv-
ing and across the street from Sun City Boulevard.
Improvement Projects in West Roseville include: City Resources
Now in operation, The Campus Oaks Fire Station 8 behind the Nugget Development: www.roseville.ca.us/DevelopmentDecoded
th
Market on Blue Oaks. The dedication opening is March 8 at 10 Open Project: www.roseville.ca.us/projects
am, 7951 Painted Dessert Drive. Connect to the City: www.roseville.ca.us/connect
Follow city updates: Facebook, X (Twitter), Instagram, Nextdoor,
The Roseville Soccer Complex under construction, completion late YouTube, Linkedin
2025. Report Issues or get answers to your questions download the My
Roseville Pkwy extension to close gap between Washington & Roseville App.
Foothills (now open) $26M budget. Completed early for $22.3 mil- www.roseville.ca.us/myRSVL or call 866-25-ROSIE (chatbot).
lion.
March 2025 Page 14