Detailed Design  9.6.5  Flow controls for SuDS  Silt is trapped at source in SuDS components   9.6.6  The importance of protected openings  Detailed Design

                                                             SuDS components such as permeable
      There are no minimum thresholds for
 Attenuation storage within sub-catchments
                                                             pavements, bioretention or filter drains are
      attenuated flow rates in SuDS design.
 and settles out along the management train.
 and along the management train can require
                                                             pre-filtered, and assuming collection through
 Where slow movement of flow is maintained
      Previously the drainage industry has applied
 several flow controls. Flow controls come in
                                                             perforated pipes or similar, the flow control
 throughout, floating debris that easily blocks
      a minimum flow rate of 5 l/s but this does not
 many forms including orifice plates, slot or
                                                             opening requires little additional protection.
 outlets is not driven against openings; as is
      take into account the need in SuDS for low
 V-notch weirs and vortex controls. Any type
      flow rate controls and the design of
 the case with conventional drainage. Simple
 of flow controls can be prone to blockage
 design features such as sloping headwalls
 unless the opening is protected.
                                                             ponds and basins, require additional
 can direct floating debris past the outlet as
                                                             protection. One way to provide this
      Small sites and sub-catchments of larger
 The rate of flow of water through SuDS
 the storage structure fills.  protected openings.           Open SuDS components such as swales,
 components is slow as it is restricted to   sites may need to meet minimal outflow flow   protection is to use a stainless steel basket
 ‘greenfield rates’ of runoff through each flow   rates. Flows can be controlled down to 0.5   filled with 80-150mm stone with the
 control. There should always be an overflow   – 2 l/s using small openings (15-20mm   connecting pipe opening set within the stone
 arrangement to deal with blockage or   diameter) with shallow depth of storage.   to prevent floating debris reaching the flow
 exceedance of the design storm.                             control.
      A stainless steel mesh basket filled with 80-
      150mm aggregate forms an effective
      protection for pipe openings. Note the pipe
      opening has a mesh guard to stop stone
      migrating through the pipe.

 97                                                                                                                98






 Orifice flow control chambers such as this one
 by Controflow are simple, reliable,
 cost-effective and easy to maintain.

 Flow controls in the landscape can make
 interesting features and help tell the story of
 how the system works.  Although more prone
 to blockage, features such as this slot weir at   Key points to be considered when designing   pass over the outlet as water rises in the
 Hollington School are very easy to unblock.
      protected openings:                                       SuDS component.

         ■  Protection to the opening should be of a            ■  Openings in the protective screen should
          reasonable surface area to allow for                  be smaller than the orifice opening size,
          accumulation of litter and vegetation                 thus any residual silt passing through
          across the surface of the protection.                 protective screen will pass through the
                                                                orifice opening.
         ■  Outlets in open structures should be
          located on a slope to encourage debris to



 Newham Council SuDS D & E Guide                                                                        © 2020 McCloy Consulting & Robert Bray Associates  Newham Council SuDS D & E Guide                                                                        © 2020 McCloy Consulting & Robert Bray Associates