Page 106 - Updated SuDS Design & Evaluation Guide-Newham V3 Spreads
P. 106

Detailed Design  Approach 1 - worked example                                                                           9.7  Water quality                                     Open water features should not receive flows          Detailed Design


                                                                                                                             Rainfall picks up pollution from development
           For the purpose of the example the following
                                                                                                                             surfaces. As runoff moves slowly through
                                                                                                                                                                                    directly from development without sufficient
           rates are assumed:
           •
               1 in 1 year        3.5 l/s
                                                                                                                             SuDS components most pollution is removed
                                                                                                                                                                                    treatment.
           •
               1 in 100 year    11.1 l/s
                                                                                                                             through sedimentation, filtration and
                                                                                                                                                                                       ■
                                                                                                                                                                                       Hydrocarbons remain in pond sediments
           Depths of storage are assumed as 150mm and
                                                                                                                             bioremediation.  Naturally occurring
                                                                                                                                                                                       for extended periods.
           600mm for 1 in 1 year and 1 in 100 year return
                                                                                                                             processes in many SuDS components break
           periods respectively.
           1 in 1 year
                                                                                                                                                                                       the aquatic environment and add to
                                                                                                                             no build up or need for removal of this
           65mm opening with 150mm depth of storage for 1                       450mm additional storage -  422mm head for 2nd orifice  down organic pollution, meaning that there is     ■  Silts which carry heavy metals impact on
           in 1 year, which provides 3.5 l/s outflow .                 600mm – total depth of storage  1 in 100 year rainfall + CCA  pollution over time.                              maintenance problems due to the build-
           1 in 100 year                                                                    55mm dia.                        The NPPF sets an obligation on proposed                   up of toxic sediments.
           65mm opening for 600mm depth of storage                                          opening                          development to have no negative impact on              The amenity and biodiversity value of ponds
           provides outflow rate of 6.9 l/s. Allowable                                                                       the environment and encourages provisioning            and wetlands should be protected with
           discharge is 11.1l/s.                                                                                             opportunities for biodiversity and habitat             pollutants removed at source and along the
           Therefore 11.1 – 6.9 = 4.2 l/s. The additional flow                                                               creation, not just in the wider landscape, but         management train.
           will be provided by an additional opening which                      150mm 1in1   storage  65mm dia.
           will only operate once the 1 in 1 year storage is                                opening                          within development.
           utilised.                                                                                                         Using source control and the management
           Using an additional 55mm opening with invert                                                                      train, SuDS delivers the requirements of
           150mm above base invert of storage provides 4.2                                                                   NPPF by providing a controlled flow of clean            NPPF Paragraphs 165 and 170
           l/s outflow
                                                                                                                             water through the development.
  101                                                                                                                                                                                                                                     102
           9.6.8.2  Approach 2 methodology
                                                                 1.  Establish the Qbar rate for the flow
           A single opening can also be sized to                     control location. The Qbar rate should be
           discharge at Qbar for the 1 in 100 year + CCA             proportional to the contributing
           rainfall event. This does not meet the                    catchment.
           requirements of NSTS S2 but can be                    2.  Define the maximum storage depth. For                   9.7.1  The objectives of designing for water quality
           considered to demonstrate S6 as more flow                 example 600mm could be adopted for
           is held back on site for longer.                          the 1 in 100 year + CCA  rainfall event.                   ■  Treat runoff to prevent negative impacts            ■  Manage surface water runoff at or close

           The Qbar (or Qmed) flow rate will occur                   Define the maximum storage depth.                           to the development’s landscape and                    to source and at or near the surface
                                                                                                                                 biodiversity as well as receiving                     where possible to begin treatment quickly
           whenever the storage volume is full and the           3.  Define the orifice invert. A reasonable
           design head is reached.  This methodology is              starting point is to set the invert at the                  watercourses and water bodies within the              and maximise treatment through the
                                                                                                                                 wider landscape.                                      system.
           simpler to apply than Approach 1 as there is              base (or slightly below the base) of
           only one target flow to be sized for, however,            storage.                                                   ■  Design for interception losses to occur for      Where water quantity design adopts a SuDS
           it may also result in increased storage               4.  Using the appropriate orifice equation                      most small rainfall events so that the most        management train approach, as outlined in
           volumes.                                                  establish the opening size which will                       polluted part of runoff is more effectively        this document, water quality objectives are
           The following steps outline the process of                convey the required QBar flow rate at the                   held and treated on site.                          normally achieved by default, due to the
           calculating the opening size of an orifice to             defined 1 in 100 year head (depth of water                                                                     number of components already limited in

           discharge at Qbar rate.                                   above the orifice).                                                                                            series.


           Newham Council SuDS D & E Guide                                                                        © 2020 McCloy Consulting & Robert Bray Associates  Newham Council SuDS D & E Guide                                                                        © 2020 McCloy Consulting & Robert Bray Associates
   101   102   103   104   105   106   107   108   109   110   111