Page 24 - Newham SuDS DESIGN & EVALUATION GUIDE
P. 24

Overview  5.3  The objectives of the                        5.4  SuDS design is considered                             5.5  SuDS design is evaluated at each subsequent design stage                                                Overview

           evaluation process
                                                                  at the beginning
                                                                                                                                                                                    The basic requirements of amenity and
                                                                                                                             All aspects of SuDS design should be
                                                                                                                                                                                    biodiversity must be demonstrated at each
                                                                                                                             evaluated at each design stage.
           Throughout the various design stages the
                                                                  In the past, drainage was usually considered
                                                                                                                                                                                    design stage.
           emerging designs should be evaluated
                                                                  at the end of the design process, with a
                                                                                                                             The management of flows and volumes and
           against core design criteria relating to the
                                                                  site layout. In many respects the pipe
           four main objectives of SuDS design:                   piped drainage solution superimposed onto a                the location of attenuation storage should be          Health and safety must be considered at
                                                                                                                                                                                    each design stage, with confirmation that this
                                                                                                                             indicated to an appropriate level at the
           quantity, quality, amenity and biodiversity.           infrastructure was independent of the                      Concept, Outline and final Detail Design               has been achieved through the ‘safety by
                                                                  topography, geology and other hydraulic and                stages.                                                design’ principle (see section 8.5).
           The objectives of the evaluation process are
                                                                  environmental characteristics of the site.
           to ensure that SuDS:                                                                                              Similarly, the design will demonstrate the use         In the same way, effective, safe and cost-
                                                                  Sustainable drainage, however, must be                     of appropriate source control measures,                effective maintenance of the SuDS scheme
              ■  meet mandatory (NSTS) and LPA
               requirements for water quantity and                integrated into the site design. It should                 conveyance and other SuDS components and               will be ensured through careful design at
                                                                  reflect the topography, geology and drainage               how these are arranged in a management                 every stage.
               quality, amenity and biodiversity
                                                                  characteristics of the site together with the              train with discreet sub-catchments.
              ■  maximise opportunities for multi-                character of the landscape and have due
               functionality and amenity uses                     consideration of any impact on heritage

              ■  enhance biodiversity throughout the              assets.
               development                                        SuDS Concept Design ensures that SuDS can
              ■  take opportunities to conserve and               influence the layout of the development and

               enhance heritage assets and the historic           is a key part of pre-application discussions.                                                            Design Note:
               environment                                                                                                      As SuDS components don’t manage water most of the time, avoid colouring them blue on
  19                                                                                                                                                                                                                                      20
              ■  integrate into the development’s layout                                                                           plan. Blue is best used for denoting permanent water bodies, like ponds and wetlands.
               and design
              ■  are appropriate, cost-effective and robust               A wetland at Fort Royal Primary School,            The ‘swale maze’ at Redhill School is usable as a
                                                                     Worcestershire, enhances biodiversity within            play and education space when it’s not raining
              ■  are practical to maintain in the long term.
                                                                                               the school grounds.           and even in small rainfall events.