Page 81 - Newham SuDS DESIGN & EVALUATION GUIDE
P. 81

Detailed Design  9.4  Critical levels                          ■   ■  Areas contributing to a storage             Detailed Design


      Levels are important in any drainage system
                                                                component should not be situated below
      and especially so for surface based SuDS.
                                                                the top level of storage as they may flood
      The proposed surface levels should align with
                                                                prior to the storage being filled.
      the modified flow route analysis in providing
      a flow path across the site and storage
                                                                For storage components that are sloping,
      volumes can be significantly affected by
      inaccurate levels.
                                                                basins, the ‘effective’ storage should be
                                                                determined rather than the entire volume
      The following levels should be evaluated                  such as permeable pavements or linear
      when developing or reviewing a design:                    of the structure.

         ■  The flow control invert level relative to           ■  A review of site levels should not identify
          storage - the flow control should not be              any obvious obstructions along

          situated above the base level of the                  exceedance flow paths.
          storage component unless there is a
                                                                                  Note :
          requirement for permanent or semi-
          permanent water.                                    The LLFA will carry out a high-level review
                                                                  of levels only - Liability for design is
         ■  The overflow level should demonstrate
                                                                 retained by the designer in all cases.
          that the required volume of storage is
          contained between the flow control invert
          level and the overflow level.                                      Grey to Green project, Sheffield.
 75                                                             The 3 flow control criteria: low flow, overflow    76
      Facing: Accurate levels were critical at Bewdley                     and exceedance are demonstrated
      School Science Block.                                                                    elegantly here.



































 London Borough of Newham SuDS D & E Guide                                                     © 2018 McCloy Consulting & Robert Bray Associates  London Borough of Newham SuDS D & E Guide                                                     © 2018 McCloy Consulting & Robert Bray Associates
   76   77   78   79   80   81   82   83   84   85   86