Page 76 - Newham SuDS DESIGN & EVALUATION GUIDE
P. 76

Detailed Design                                                                                                        9.3.3  Supporting information                             ■   ■  Thames Water consent to discharge to        Detailed Design

                                                                                                                             Depending on the nature of the scheme
                                                                                                                                                                                       public sewer if sewer connection is
                                                                                                                             various investigations, tests and calculations
                                                                                                                                                                                       required.   Refer to Thames Water advice
                                                                                                                             may need to be performed along with
                                                                                                                                                                                       on the process required to apply for
                                                                                                                             obtaining necessary consents:
                                                                                                                                                                                       discharge consent.
                                                                                                                                ■
                                                                                                                                 Ground investigation, including infiltration
                                                                                                                                                                                       Proposed maintenance schedule and
                                                                                                                                 monitoring as appropriate.
                                                                                                                                                                                       all non adopted drainage.  Identify any
                                                                                                                                ■  test results, soil testing and groundwater          confirmed management arrangements for
                                                                                                                                 Design calculations which demonstrate
                                                                                                                                                                                       proposed split of the SuDS between
                                                                                                                                 compliance with the design criteria for the
                                                                                                                                                                                       private (curtilage) and public (open space
                                                                                                                                 site including all hydraulic and structural
                                                                                                                                                                                       or highway) land.
                                                                                                                                 calculations for permeable pavements
                                                                                                                                 and underground storage structures as                 ■  Designers hazard and risk assessment- to
                                                                                                                                 appropriate.                                          consider construction, maintenance and
                                                                                                                                                                                       operation by personnel and day to day
                                                                                                                                ■  Completion of standard design
                                                                                                                                                                                       site use by public.
                                                                                                                                 information forms as may be provided by
                                                                                                                                 the LPA.                                              ■  Details of any informative signage
                                                                                                                                                                                       proposed for SuDS.
                                                                                                                                ■  Details of any offsite works required,

                                                                                                                                 together with any necessary consents in
                                                                                                                                 place (or can be obtained).
  71                                                                                                                                                                                                                                      72
                                                                                                                                ■  Confirmation that discharge consents are

                                                                                                                                 in place (or can be obtained):
                                                                                                                                 Environmental Permit (Environment
                                                                                                                                 Agency) - an Environmental Permit may
                                                                                                                                 be required for works in, under, over or
                                                                                                                                 near a main river (including where the
                                                                                                                                 river is in a culvert), works on or near a
                                                                                                                                 flood defence or for works in the flood
                                                                                                                                 plain of a main river; Ordinary
                                                                                                                                 Watercourse Consent (LLFA) for any
                                                                                                                                 structure with the potential to affect flows
                                                                                                                                 in an ordinary watercourse; or highway
                                                                                                                                 drain (Highways Authority). Discussions
                                                                                                                                 should be held with EA for Infiltration
                                                                                                                                 within Source Protection Zone areas or
                                                 Plan excerpt: proposed new Holyoaks Primary School, Redditch.                   higher risk sites; Local Authority and
                                           The detail design stage confirms the layout, character and function of
                                                   the SuDS, Including detailed levels, volumes, flow controls and               Inland Drainage Board byelaws,
                                                                                               component design.                 comments and constraints.


           London Borough of Newham SuDS D & E Guide                                                     © 2018 McCloy Consulting & Robert Bray Associates  London Borough of Newham SuDS D & E Guide                                                     © 2018 McCloy Consulting & Robert Bray Associates
   71   72   73   74   75   76   77   78   79   80   81