Page 14 - MEOG Week 37 2021
P. 14

MEOG                                        NEWS IN BRIEF                                              MEOG







       group of international offshore contractors.  China’s Offshore Oil Engineering Company   SERVICES
         The Zuluf incremental project is a key   are said to be in the fray, another source said.
       element of Saudi Arabia’s strategy to boost its   The third Zuluf tender – CRPO 81   Honeywell, Aramco ink
       oil production to 13 million barrels per day.   (Package 3) – comprises multiple additional
       The much-delayed development is expected   water-injection wellhead topsides, one water-  digital technology solutions
       to cost up to $8 billion and aims to boost   injection tie-in platform plus associated
       crude output by as much as 600,000 barrels   offshore infrastructure.    deal
       per day, almost doubling the field’s production   The six bidders eyeing the second package
       capacity.                           are also understood to chasing CRPO 81,   Global technology company Honeywell
         Zuluf is said to be producing about 550,000   Upstream understands.    has signed a MoU with state oil giant Saudi
       to 600,000 bpd of oil from the Arabian   A fourth package – CRPO 82 (Package 4) –   Aramco to explore the co-development
       Medium reservoir and Aramco is targeting   is expected to include at least 12 oil-handling   and commercialization of next-generation
       additional volumes from the Arabian Heavy   wellhead topsides, two oil tie-in platforms   digital technology solutions designed to
       reservoir in its next expansion phase.  and one electrical distribution platform,   help improve productivity, sustainability
         Aramco earlier this year tendered for a   while a fifth contract – CRPO 83 (Package   and operational excellence of industrial
       quintet of offshore jobs, dubbed contract   5) – is made up of 12 additional oil-handling   companies, on a global scale.
       release purchase orders (CRPOs), that   wellhead topsides, two oil tie-in platforms,   The fully digital technology will leverage
       combined are likely to be valued upwards of   as well as infield pipelines and cables, project   Aramco’s Plant.Digital system and its
       $5 billion.                         watchers told Upstream.              technical and domain knowledge in end-
         The tenders for the offshore facilities have   Bidders for the fourth and fifth packages   to-end plant operations, combined with
       been in the works for several years but had   are thought to be similar to the second and   Honeywell’s global software development and
       been put on hold due to the coronavirus crisis   third packages, barring Sapura and Lamprell’s   commercialization expertise.
       and plummeting oil demand.          participation in Package 4, a third person said.  It will be brought to market through a joint
         However, Aramco is said this year to have   Up to 10 LTA contractors are a part of   venture (JV) between the two companies that
       fast-tracked its key offshore incremental   Aramco’s coveted LTA arrangement, but a   will also serve as a software system integrator
       projects, on the back of improved market   few players chose to stay away from the Zuluf   to reduce time-to-value for customers, said
       fundamentals and higher oil prices.  tender process.                     the statement from Honeywell.
         The first tender package – CRPO 79   Those that are said to be out of the fray   The digitalized Plant.Digital suite will
       (Package 1) – covers multiple segments of   include a grouping of UK-based TechnipFMC   provide industrial companies with the tools,
       onshore and offshore 42-inch oil trunklines.  and Malaysia Marine & Heavy Engineering,   processes and practices they need to run
         Those said to have bid include McDermott   Dynamic Industries of the US and South   plant operations more effectively and will
       of the US, Italy’s Saipem, a partnership of   Korea’s Hyundai Heavy Industries.  accelerate sustainable digital transformation
       India’s Larsen & Toubro with Oslo-listed   In addition to the offshore projects, EPC   and operational excellence initiatives across
       Subsea 7, and Abu Dhabi’s National Petroleum  players are chasing two substantial packages   industries.
       Construction Company, one source said.  for Zuluf’s onshore scope of work.  This dynamic entity will emphasize on the
         A second package – CRPO 80 (Package   The two contracts are thought to be   development and deployment of Operations
       2) – comprises nine water-injection wellhead   together worth more than $2.5 billion and are   Technology (OT) solutions and Digital
       topsides, two water-injection tie-in platforms,   a key part of the project.  Transformation consulting, it stated.
       infield lines and subsea cables.       The Zuluf field is located about 40   The proposed JV is expected to create more
         Six bidders are said to be eyeing this   kilometres offshore Saudi Arabia’s north-east   than 500 jobs in Saudi Arabia within five
       package.                            coast in about 40 metres of water.   years of its launch, supporting the country’s
         In addition to the four contenders chasing   UPSTREAM                  In-Kingdom Total Value Add (IKTVA)
       the first package, a grouping of Malaysia’s                              Program, designed to boost Saudi economic
       Sapura Energy with UK-listed Lamprell, and                               and workforce development.





























       P14                                      www. NEWSBASE .com                      Week 37   15•September•2021
   9   10   11   12   13   14   15   16   17   18