Page 15 - GLNG Week 20 2021
P. 15

GLNG                                        NEWS IN BRIEF                                             GLNG








                                                                                Montoir-de-Bretagne LNG

                                                                                terminal: Gas send-out to

                                                                                the grid halted

                                                                                After detecting leak on the insulating joint
                                                                                in the gas pipe linking the LNG terminal to
                                                                                the transmission grid, Elengy, in accordance
                                                                                with its procedures, informed the competent
                                                                                authorities. For safety reasons, Elengy decided
                                                                                to stop send-out into the transmission grid on
                                                                                May 4.
                                                                                  Elengy removed the gas from the relevant
                                                                                pipe and isolated the terminal from the
                                                                                transmission grid. The preparatory work for
                                                                                the repair started on May 12 and is passing off
                                                                                safely.
                                                                                  During all work on this gas pipe, a flame
                                                                                from the terminal’s flare stack will be visible.
                                                                                Using flare stack to burn the boil off gas is
                                                                                normal and controlled.
                                                                                  The teams remain mobilised and are
       NYK Group company obtains           LNG carriers and oil tankers to complete   currently working to restart send out as
                                                                                soon as possible, in coordination with the
                                           training without having to travel to Singapore.
       DNV certification for online        training in September 2020, and afterward   competent authorities.
                                              NYKSM introduced online ship handling
                                                                                ELENGY, May 17, 2021
       cargo-handling training for         added online cargo-handling training for   LNG Energy Integrity
                                           LPG carriers and car carriers. The company
       LNG carriers and oil tankers        is currently working to utilize all resources
                                           to introduce online and e-learning options
       Cargo-handling simulator training for LNG   to all types of training. The NYK Group will   delivery
       carriers and oil tankers conducted by NYK   continue its efforts to train seafarers even   On May 14, 2021, the LNG Energy Integrity
       ShipManagement (NYKSM; headquarters:   during the COVID-19 pandemic to ensure   (173,400 cubic metres), built by Daewoo
       Singapore) in an online environment has   the continuing necessary transport of food,   Shipbuilding & Marine Engineering (DSME),
       been certified by DNV, a ship classification   supplies, and energy resources.  Korea, was delivered to Alpha Gas.
       association based in Norway. This is the first   NYK GROUP, May 17, 2021  ALPHA GAS, May 14, 2021
       time in Asia that DNV certification has been
       obtained for online cargo-handling simulator                             ‘Green Funnel’ project
       training for oil tankers.           EUROPE
         The DNV certification confirms that                                    celebrates milestone 150th
       the training content follows the guidelines   Zeebrugge LNG terminal to
       provided in the IMO model courses and that                               LNG fuelling
       the training is conducted effectively.  build four additional truck
         The training is provided for seafarers                                 Recently, Sovcomflot (SCF Group) and Shell
       boarding LNG carriers and oil tankers for the   loading bays             performed a landmark 150th marine LNG
       first time. It follows the IMO model courses                             fuelling operation for SCF’s ‘Green Funnel’
       and comprises content unique to NYK Group,   A total of four additional truck loading bays   Aframax tankers.
       including NYK’s safety culture, operational   will be built at the Zeebrugge LNG terminal   Since operations began in 2018, SCF’s
       standards, current business conditions, and   to continue supporting the freight transport   ‘Green Funnel’ Aframaxes have taken over
       history. Use of the cargo handling simulator is   sector in its switch to liquefied natural gas   62,000 tonnes of marine LNG fuel from Shell
       also included. Before this training was made   (LNG) as low emission fuel. Carbon-neutral   and all 150 operations were performed safely
       available, participants would need to travel   bio-LNG will become an option as well.  without incident, injury or loss of fuel.
       to the NYKSM training centre in Singapore   With demand for LNG as low emission   The 150th operation was performed by
       for simulator training. However, a cloud-  fuel soaring, the existing truck loading bays   Korolev Prospect, on time charter to Chevron,
       based cargo-handling simulator now makes   at the Zeebrugge LNG terminal are gradually   receiving 600 tonnes of marine LNG from
       training in an online environment possible.   being used at their maximum capacity. While   Shell and delivered by Q-LNG 4000 outside
       All content, including cloud-based cargo-  the number of truck loadings in 2017 was still   Port Canaveral, Florida, whilst en route from
       handling simulator training and lectures,   around 1,450, the utilisation rate for this year   Denmark to the US Gulf. Chevron is using
       can now be provided online in compliance   is estimated to rise towards 6,000 loadings,   the vessel to trial the viability of dual fuelled
       with the IMO model courses. This has made   approaching the maximum capacity of 8,000.  tankers for its future operations.
       it possible for NYK Group seafarers aboard   FLUXYS, May 20, 2021          LNG fuel remains amongst the cleanest



       Week 20   21•May•2021                    www. NEWSBASE .com                                             P15
   10   11   12   13   14   15   16   17   18