  Pepper Environmental was notified and encapsulated the mastic.  New wall pads will
                             cover the encapsulation.
                           No abatement was needed.  Report was filed in the Asbestos Management Plan for
                             Rich South.
                      •  Asbestos pipe insulation found on plumbing behind the wall in the girl’s locker room at
                         Rich Central.
                           Full abatement will be needed, this is a 14-day process for notification and removal.
                           This process began 5/27/2020

                  -  The Building Automation Upgrade project at Rich South has been completed.   Closeouts
                      have been addressed and final billing was submitted.  We are happy and excited with the
                      new upgrade and look forward to continuing throughout the entire system.

                  -  Some deteriorating concrete in the parking lot of the District Office was replaced.  We
                      anticipate replacing more areas over the summer to eliminate the major tripping hazards and
                      washed-out locations.

               Updates
                  -  The Buildings and Grounds staff has begun their summer work hour schedules as required
                      by the Classified Staff collective bargaining agreement. The Buildings and Grounds
                      classified staff will be working Monday – Thursday from 7am to 4:30pm.  During our
                      summer hours we will be focusing on assisting with construction where needed, completing
                      our facility moves, and performing our normal summer cleaning and building preparations
                      for the 20/21 school year.

                  -  The Buildings and Grounds Department is looking to dispose three tractors (1 at each
                      campus) that are each approaching 40 years old or more.  These machines no longer fit our
                      need for grounds maintenance.  We will look to purchase a second skid steer for the District
                      in place of the tractors.  The skid steers are more compact, maneuverable, and can do more
                      for what we need on the school grounds than the current tractors.

                  -  We started scheduling our system inspections that occur every summer to make sure we are
                      in compliance with state and local regulations.  Some of these include our fire system,
                      sprinkler system, and back flow prevention inspections.

                  -  Our annual energy reduction event will occur on June 24 from 12pm to 1pm.  During this
                      event we reduce our kWh (electrical energy consumption) usage by shutting down major
                      electrical equipment, lighting, etc. This event will not impact District Office; it only takes
                      place at the campuses. We plan to meet our goal 100% as we did last year to get a full
                      reimbursement amount. Our reimbursement total from last year’s reduction was $37,430.50.

               Information Technology
               On Thursday, May 28 the Information Technology department began device distribution for our
               students who will be attending Summer School. Students who have requested a device


                       CHICAGO HEIGHTS   COUNTRY CLUB HILLS   MATTESON   OLYMPIA FIELDS   PARK FOREST   RICHTON PARK   UNIVERSITY
                                                                  PARK

                                            EQUAL OPPORTUNITY EMPLOYER/EDUCATOR
   150   151   152   153   154   155   156   157   158   159   160