Page 6 - What's Indiana General been cooking up in memory products
P. 6

the entire  manufacturing process-from  be-
                                                                ginning to end. A further assurance of quality
                                                                IGC products.
                                                                  Production employees undergo a six weeks
                                                                training program  using  practice frames  until
                                                                high level quality tests are passed. Our solder
                                                                school   consists   of   an   intensive   one  week
                                                                course,  and  is  NASA  approved.   IGC's  entire
                                                                quality control system  has military approval,
                                                                and  is  under constant  surveilance  by a  resi-
              :3v::::aetteti#'gthh%Sdtspf#,Catn:€''aanba'.:¥;c'kGs?maintainsthemost
                                                                dent   government   quality  representative.
                                                                  IGC's quality control  is complete.  Down  to
               Indiana  General's  product reliability extends
                                                                development   of   test   and   methods   proce-
              to  serving  the  needs  of  military,   industrial
                                                                dures used during manufacturing cycles, and
              and  commercial   applications.   For  example
              meeting some of the  most stringent  military     the  calibration  and  approval  of  all  electrical
                                                                and   mechanical   test   measurement   equip-
              and   NASA  requirements*  for  projects  such
                                                                ment. Our Q.  C.  Manual  and  Inspection  Plan
              as   the   Apollo   program's    Lunar   Excursion
                                                                are used in conjunction with every production
               Module,  and  the  Minuteman  weapons  sys-
                                                                order-and  are also military approved.  Qual-
              tem.  Or  designing  for  light  shock  and  vibra-
                                                                ity  control  is  documented  on  traveler  cards,
              tion   as   well   as   changeable   environmental
                                                                from the first manufacturing step through to
              specifications   in    process   control   applica-
              tions.  And  providing  high  volume  stack  pro-  packing and  shipping.
                                                                  IGC  also  maintains  quality  survey  reports
              duction with  optimum  repeatable character-
                                                                and  rating on  our own  vendors to assure you
               istics.                                          that every component contributes to making
                 In  short,  lGC  can  offer you  the  best  core,
                                                                lGC   planes   and   stacks   the   finest   quality
               plane  and  stack  in  a  package suited  to your
              specific    requirements.    Plus   some   extras.  product.
                                                                  This  is  Indiana  General  Memory  Products,
              Such  as  special  wiring  techniques  to  keep
              stack noise and propagation delays to a mini-     from  the  core  up.
                                                                   A   complete   technical   data   package   on
               mum.   Mechanical   engineering  in   depth   to
                                                                lGC  cores,   planes  and   stacks   is  yours   for
               solve  every conceivable  packaging  problem.    the   asking.   Write   to   Indiana   General   Cor-
               And  assistance  in  integrating  lGC's  memory
                                                                poration,  Electronics  Division/ Memory Prod-
               stack  with  your  electronics.                  ucts,  Keasbey,  New  Jersey.
                 Project  control  is  vital.  That's why  an  en-
                                                                •Mdi,ti-oEn-18,::a,DYlk.,i--i4g?22ElbLai:E?Z3944:;rof3!uZ8o.3,11'Con.
              gineer  is assigned  to  supervise  and  monitor
   1   2   3   4   5   6   7   8