Page 548 - aREA ix eXHIBITS
P. 548
RANGE OF VARIABLES
VARIABLE RANGE
1. Tools, equipment May include but not limited to:
and materials Tools and Equipment: Materials for STP/UTP:
and PPE 1.1 hammers 1.13 RJ45 connectors
1.2 extension ladders (12 ft. (shielded)
length) 1.14 RJ45 connectors
1.3 adjustable wrench (non-shielded)
1.4 fixing brackets/clamps
1.5 drill/electric drill PPE:
1.6 tape linen/steel tape 1.15 body belt & strap
1.7 RJ45 crimper 1.16 hard hat/ helmet
1.17 set gloves
Materials: 1.18 goggles
1.8 grounding wire 1.19 safety shoes
1.9 cable support 1.20 tool pouch
1.10 grounding rod 1.21 safety cones/traffic
1.11 tie wrap safety devices
1.12 terminal lug
2. Support structure 2.1 Roof
2.2 Ceiling
2.3 Pole
3. Suitable 3.1 Drilling of holes for cable entry/exit
methods of cable 3.2 Rerouting of cables to nearest possible cable entry/exit
routing points
4. Appropriate 4.1 Leadman/team leader
personnel 4.2 Supervisor
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
TRAINING REGULATIONS – BROADBAND INSTALLATION (FIXED WIRELESS SYSTEM) NC II Page 24

