Page 2 - The Consequences of an Incorrect Seismic Survey
P. 2
The Information Gathering for Professional
Engineering Work
1. Collect and process information relevant to the objective site.
2. Above ground information at and surrounding the site – surface
topography, drainage patterns, road and transportation
characteristics, sewerage trunk mains, water supply mains, power
and telecommunications availability etc.
3. Subsurface information (usually limited to within the site) –
immediate subsurface soil characteristics, ground water and
bedrock elevation and characteristics.
2