Page 7 - The Consequences of an Incorrect Seismic Survey
P. 7

For a large majority of foundation engineering work, the knowledge of

                rock head variation at a project site is of prime interest – for cost and


                time planning.

























                                                                                                                                                                                 7
   2   3   4   5   6   7   8   9   10   11   12