Page 6 - The Consequences of an Incorrect Seismic Survey
P. 6
Accomplishing the Smooth and Satisfactory Construction of an Engineered Facility –
A Wharf for 40,000 DWT Deep Ocean Going Container Vessels
September 2007 – 3 nos. hydraulic piling hammer with 200 kN driving ram mass April 2016 - During a 47 kPa Proof Load Test
on floating barges and heavy-lift cranes.
With the very expensive construction plant and equipment deployed and manufacture of custom-designed piles
required, the entire project process had to tick like clockwork from the start of the tendering process.
6