      Deep Basements - Example Projects





      Seymour Street, Central London                           Services
      Perimeter Support and Temporary Works Design
                                                                 Ÿ Ground Movement Report
      The former Marylebone Police Station has                   Ÿ Full Temporary Works Design
      been demolished to be developed into a
      mixed-use scheme in Central London. The                    Ÿ Party Wall Design Report
      new development will have seven storeys                    Ÿ Highways AIP
      with a double storey basement across the
      entire footprint. The existing liner and party             Ÿ Royal Mail Tunnel Movement Modelling
      walls along the two boundaries of the site                 Ÿ Advice on Resequencing
      will be retained along with the raft within                Ÿ Monitoring Strategy and Contingency Planning
      the footprint of the existing double storey
      basement that occupied around half of the                  Ÿ Full Contractor Support During Construction
      site.                                                      Ÿ CAT II Temporary Works Design Checks

      CGL was engaged by Galliford Try (GT) to provide
      contractor support, pre-tender outline designs, support
      regulatory approval for the project, then design the
      perimeter support systems and temporary works during
      excavation and basement construction.


      The whole area is movement sensitive, particularly the
      neighbouring buildings which are Grade II listed Victorian
      structures. The terraced buildings were bookended using
      the existing concrete lining walls and supported by four
      large steel towers.


      CGL divided the site perimeter into 8 salient design
      sections, each of which required a different design solution
      for piles or foundations depending on site conditions. Each
      perimeter design has 7-10 stages of basement
      construction thus providing a sequence and control for
      excavation to limit movements.