      Deep Basements - Example Projects





      Fitzjohn’s Avenue, Hampstead, London                     CGL devised the construction sequencing for the sensitive
      Basement Impact Assessment, Ground Modelling,            boundary perimeter protecting the assets around the sites.
      Specification and Design                                 A range of pragmatic and cost effective solutions were
                                                               introduced throughout the site, for example CGL made use
      No. 79 Fitzjohn's Avenue is a £28 million development of   of the existing reinforced concrete retaining wall by
      prestigious retirement apartments in Hampstead, London   introducing king posts to reduce new piling.  CGL also
      Borough of Camden. The development comprises five to     designed propping corbels to limit ground movement and
      seven storeys with a 12m deep basement for an            reduce risk.
      underground car stacker system.
                                                               CGL used the permanent works as reaction piles to
      CGL worked for the client, Pegasus Life and Gleeds, the   support the boundary walls during construction, a
      project manager to provide geotechnical advice for the   sustainable alternative to installing temporary piles.
      pre-planning application and during the substructure     Laterally loaded piles were designed using PLAXIS to
      construction.                                            calculate the forces from the propping scheme applied to
                                                               the piles.  The temporary works designs were used to gain
      CGL's initial brief was to provide a Basement Impact     approvals from London Borough of Camden, Highways and
      Assessment (BIA) and later a post-planning Ground        party wall engineers.
      Modelling Report (GMR). CGL has also produced enabling
      works specifications and designs that were used for third
      party stakeholder approvals.

      CGL was appointed as the primary temporary works
      designer and Certifying Engineer for the Basement
      Construction Plan (BCP). The TW design report includes
      sequencing and a fully co-ordinated TW design.

































                                                          Temporary props supporting party wall and highway for basement excavation
                                           visit our website at cgl-uk.com