Formwork




                •     All temporary works design drawings & calculations
                      should be checked and approved by a competent
                      person e.g. engineer.

                •     Plans detailing the safe methods of work for the
                      erection, use and dismantling for all temporary
                      works must be followed.
        14. Temporary Works
                •     Timber, sheet materials, proprietary formwork and
                      fixings must be checked for damage and integrity
                      before use.

                •     Discard or repair any damaged items.

                •     A Competent Person must conduct scheduled
                      inspections of all temporary works to ensure their
                      continued integrity.