Page 20 - Best Practice for Construction Projects
P. 20

Portable appliance testing (PAT)



                 •    All portable electrical equipment (leads, power

                      tools, lighting etc.) must be PAT tested every 3
                      months

                 •    The electrical equipment must display the

                      following information on a legible tag:

                        o the date the PAT test took place

                        o the expiry of the PAT test
        2. Equipment    o the name of the company who did the PAT
                        o the name of the company the PAT testing

                             was completed for



                             testing.

                 •
                      All electrical equipment and leads must be
                      visually inspected for damage before each use
                      and to ensure tag is still in place and legible;

                      any damaged equipment or leads must be
                      removed from site for replacement/repair.













     3             Visual Standards | Feb. 2019
   15   16   17   18   19   20   21   22   23   24   25