Page 26 - Best Practice for Construction Projects
P. 26

3-phase electrical leads



                 •    Braided leads are a requirement on anything

                      above 110v.

                 •    Recommended that all connections on these
                      leads have ferrules for terminating to plug top

                      to ensure a tight connection.

                 •    Part of the quarterly inspection involves a
                      Portable Appliance Test and a visual

                      inspection. This requires opening plug tops to
        2. Equipment  •  ensure connections are tight.


                      The equipment must display the following

                      information on a legible tag:

                        o The date the PAT test took place

                        o The expiry of the PAT test

                        o The name of the company the PAT

                             testing was completed for

                        o The name of the company who did the
                             PAT testing



                                                                                   Ferrule required or
                                                                                terminating to plug top



     9             Visual Standards | Feb. 2019
   21   22   23   24   25   26   27   28   29   30   31