3-phase electrical leads
• Braided leads are a requirement on anything
above 110v.
• Recommended that all connections on these
leads have ferrules for terminating to plug top
to ensure a tight connection.
• Part of the quarterly inspection involves a
Portable Appliance Test and a visual
inspection. This requires opening plug tops to
2. Equipment • ensure connections are tight.
The equipment must display the following
information on a legible tag:
o The date the PAT test took place
o The expiry of the PAT test
o The name of the company the PAT
testing was completed for
o The name of the company who did the
PAT testing
Ferrule required or
terminating to plug top
9 Visual Standards | Feb. 2019