Page 1121 - Workshop Manual - Aumark (BJ1051)
P. 1121

51-29
                                              Heater and air conditioner-hot air water tank

               17.    Install instrument panel (refer to “chapter 73 instrument panel/combination meter/cigar
                      lighter- instrument panel, replacement”)
               18.    Install hot air water pipe 1 and hot air water pipe 2 (refer to “chapter 51 heater and air
                      conditioner- hot air water pipe, replacement”)
                                                                19.    Fill coolant liquid
                                                                (a).    Screw down the hot air water drain valve













                                                                (b).    Fill coolant liquid of engine (Refer to the
                                                                       service manual with  isf of cummins
                                                                       engine)















                                                                                                                    51










































                                                                                                        Page 1121
   1116   1117   1118   1119   1120   1121   1122   1123   1124   1125   1126