UNDER











                 THE BRIDGE

















                 The Erskine Bridge is an iconic Scottish landmark, connecting     commissioned within the three-year
                 the communities of West Dunbartonshire and Renfrewshire           period before the bridge works began.
                                                                                     Faced with an ageing asset, located
                 across the Clyde for nearly 50 years. Now, a challenging          in a harsh environment with ongoing
                 project has tested the skills of engineers at SGN, with the       and expensive maintenance liabilities,
                 construction of an almost 2km-long pipeline under the river.      SGN had already been looking into
                 Project Manager David Rae explains                                replacing this crossing.
                                                                                   Refurbishment and revalidation
                    n 2015, Transport Scotland notified   formed a critical link in SGN’s central   would have required a full
                    SGN that it proposed to undertake   39bar transmission system, with the
                    a full refurbishment of the Erskine   450mm diameter pipeline splitting into   closure of the bridge and
                    suspension bridge which crosses the   two 300mm pipelines, one below each   complex temporary works
                I River Clyde to the west of Glasgow.   footpath on the extremities of the bridge.   solutions to gain access to the
                   This bridge is a multi-span, cable-  This pipework configuration meant
                 stayed box girder bridge spanning the   that the bridge sections could not   pipelines below the bridge deck.
                 river. It is over 1,300m in length and the   be in-line inspected, resulting in a   This option was discounted as
                 deck is 45m above the river, with the   requirement for bi-annual, physical   the road’s authority would not
                 pylons a further 38m above the deck.   inspection of the two 300mm pipelines.   permit a full closure of this vital
                   The main span of the bridge is 305m   This required prolonged use of the
                 wide and connects the communities   bridge’s inspection gantry vehicle, which   link in Scotland’s transport
                 of West Dunbartonshire and       incurred a significant recurring cost.  infrastructure
                 Renfrewshire. As well as crossing the   Planned bridge refurbishment
                 Clyde, the bridge also crosses the Forth   works required the removal of the
                 and Clyde Canal and the North Clyde   footway deck plates, presenting   The bridge refurbishment presented
                 railway line. A local commuter railway   SGN with the unique opportunity to   an ideal opportunity to remove two
                 station is situated beneath the bridge at   refurbish the existing pipelines or   50-year-old, high pressure pipelines
                 the north side.                  remove them, if an alternative crossing   from one of Scotland’s busiest and most
                   Unknown to most people, the bridge   could be designed, constructed and   iconic bridges. The only drawback was