Page 5 - 360 Virtual Inspection
P. 5

3.    Clean and blast the connection in the photos below to avoid any further corrosion, and apply
                        the protective coating to project specification.






























                  4.    Blast and remove material buildup as recommended in the methodology document. Measure
                        the steel thickness and report to Yenem for confirmation prior to the repair works.





































                                                                                                       Page 3
   1   2   3   4   5   6   7   8