Monkey Electrocuted
72, 16% 29, 6% 22, 5% Bad Weather (Heavy rain
and thundering)
Bird electrocuted/ Bird nest
fallen
Trip shed/ ELS shed/ Panto
defect
132, 28% Tripping with siding CBs
184, 39% Tree branches Fallen
11, 2% 13, 3% 4, 1% Short Circuit Test
Foreign material on OHE/
Loco
The following preventive measures taken to reduce CB trippings:
Sl.No. Preventive Measures Action Taken
Replacement of
Bracket/Stay insulators 243 No's Stay
insulators,
1 (with composite in stone 303 No's bracket
pelting) including BHEL insulators changed
make insulators.
All the sidings
Provision of CB’s for
2 provided with
siding.
separate CBs.
Nylon meshes provision
in portals to reduce the
3 17 Nos. Of Portals
bird nest forming and for
monkeys.