Page 142 - booklet draft
P. 142

Performance Statistics

                                                                  2020-21           2021-22            2022-23
            S. No                 Description
                                                                (Upto Oct)        (Upto Oct)         (Upto Oct)

               1           Average loco holding                    244.71            265.57             257.57

               2          Average Goods Outage                     111.34            126.83             128.28

               3                Passenger Link                     101.61            110.14             107.2
                      Punctuality incidences (Loco)
               4                                                     3.3               7.9               17.9
                                   /100 locos

               5                 Asset failures                      16.3              58.7              75.5
                       Un-Usual Occurrences (UOR)

                                 per 100 locos                       87.0             113.0             114.8
                            Statistical ineffective
               6                                                    10.21              8.33              6.84
                                 (percentage)
                             Hourly ineffective %                    13.0             10.76              8.58

               7        Un-schedule visits/100 locos                 95.6             121.6              84.6
                          Un-schedule lifting's/ 100
               8                      locos.                         31.9              80.6              36.1

                        (Including minor schedules)
               9           Major Inspection done

              (a)         Term Overhauling (TOH)                      36                29                34
                         Intermediate Overhauling
              (b)                                                      7                25                22
                                      (IOH)
                                       Total                          43                54                56

                      Periodical Overhauling (POH)/
              (c)                                                   10/0               4/0                3/0
                      Mid Term Rehabilitation (MTR)
   137   138   139   140   141   142   143   144   145   146   147