Page 135 - booklet draft
P. 135
double cleats on coping of platform. Total 272 new Cleats has been
provided and all other structure bonds were ensured in
all station in the division for intactness and to strive against above said
type of failures.
Fig: Double cleats for bonds on PF
Provision of Nylon net on portals:
As per TI/MI/0050 issued by RDSO to
prevent from Bird menace on Traction
installation by provision of Nylon net
inside the existing fabricated structures.
33 No’s of nylon mesh provided.
Fig. Nylon mesh on portals
Provision of Additional Protection for Bond
Sleeves (Double Wall Corrugated Pipes)
Heavy Duty Piping for additional
protection over bond sleeves. Help in
reducing the track circuit failures and
704 Nos. of bonds are painted with
black colour.
Fig: Additional Protection for Bond Sleeves
e) Data of Manpower and Yard Stick:
Shortage of
Manpower Sanctioned Available Yard stick
Description TKM manpower as
as per RB man power manpower available
per RB policy
Non-sub urban 0.18
area 3147.53 692 621 554 (Against 118
(0.22* yard
stick/TKM) 0.22)