Page 130 - booklet draft
P. 130

a solution for getting power by isolating all the individual lines at LPI, by

           erecting the 4 new Sectioning insulators and isolators and by converting
           UIOL to IOL at LPI yard.




                    With this modification, isolation of the individual lines becomes
           easy and there by getting power blocks for OHE maintenance.
           Moreover this modification increases the effective utilisation of

           manpower by reducing the ideal setting of staff due to non-availability
           of power block.















                                          Fig: Loop line isolation work at LPI




               Modification of OHE at 163 KM @ PDPL-NZB section:

                        State government has taken up the ROB work at 163 KM (LC-
           3), OHE should be made dead for erecting girder and for bridge works

           at the site.  Same was done by creating temporary Section Insulator
           neutral section by erecting four section insulators and one isolator at
           Loc. 163/18, 19, 20 & 164/1.















                                          Fig: Modification works at 163 Km



              Modifications at BPA Yard:
                  The OHE of suspended goods line 7 was dismantled and securely

           anchored at BPA yard. As the line was suspended long back, big trees
           are proliferated, any tree falling on OHE will leads to major breakdown
           as the suspended OHE is directly connected to main line.