                                                                                                   History of Aruba’s airport



                                                                                                   was  completed  in  1954,  ed and the start of the jet
                                                                                                   the  new  6,445  ft.  lighted  age commenced in Aruba.
                                                                                                   runway  and  4,500  ft.  par-  The first two jet landings in
                                                                                                   allel  taxiway  configuration  Aruba  were  Jet  Clipper
                                                                                                   served to upgrade the air-   “Aruba” of the Pan Ameri-
                                                                                                   port  from  Class  D  to  Class  can Airways and the Henry
                                                                                                   C  in  the  International  Civil  Dunant of KLM. A year later
                                                                                                   Aviation    Organization’s  in  1965  the  ground  break-
                                                                                                   (ICAO) rating system which  ing  for  the  construction  of
                                                                                                   existed at the time.         the  fourth  terminal  build-
                                                                                                   In  1962,  plans  started  on  ing took place, which was
                                                                                                   the expansion of the airport  inaugurated on November
                                                                                                   to accommodate the new  8th, 1972.
                                                                                                   jet aircraft entering into ser-  In  1997  the  last  major  ex-
                                                                                                   vice,  and  to  plan  for  the  pansion project for the air-
                                                                                                   passengers expected from  port,  Beatrix  2000,  began.
                                                                                                   new  and  larger  airplanes.  The  first  phase  of  the  proj-
                                                                                                   The  plans  included  a  new  ect  was  completed  and
                                                                                                   terminal  on  the  north  side  inaugurated on September
                                                                                                   of  the  airport;  a  complete  1, 1999.
                       1955, third terminal building, arrival of Queen Juliana & Prince Bernhard   new  runway  laid  over  the  The  Beatrix  2000  design  in-
                                                                                                   existing  one  including  a  cluded  an  expansion  and
            Continued from Page 31       two  and  a  half  inches  of  strip while the main runway  3,000  ft.  extension  into  the  renovation  to  the  existing
                                         paving  covered  the  run-   was being repaired. In Sep-  lagoon,  relocation  of  the  1972  terminal;  and  includ-
            Nearly a decade after the  way. The paving break-ups  tember 1953, the 4,500 foot  Oranjestad  –  San  Nicolas  ed  a  new  arrival  immigra-
            Government of Aruba con-     threatened  to  close  the  combination  runway  and  highway  around  the  air-       tion  hall,  baggage  claim,
            structed the original paved  field  so  the  island  govern-  taxiway  was  completed,  port,  and  new  glide-path  8  contact  gates,  a  new
            runway,  it  was  discovered  ment  decided  to  adopt  a  which  served  as  a  substi-  lighting  needed  for  jet  air-  concession  area,  and  two
            while  repairing  42  paving  two-fold program; to pave  tute  for  the  main  runway  craft approaches.            separated  check-in  build-
            breaks  which  appeared  an area 133 feet wide and  while it was being repaired  On  April  10,  1964,  the  first  ings  for  U.S.  and  non-  U.S.
            between  December  1950  4,500 feet long to be used  and  lengthened.  When  phase,  the  extension  of  bound flights. q
            and  March  1951  that  only  as  a  runway  and  taxi-way  work  on  the  main  runway  the  runway  was  complet-    Source: airportaruba.com.