Q When will the new
ship be ready? A It's still on schedule
for 2021.
◀02
Q Why are we
chartering a ship instead A
of building our own? Bareboat chartering means the
ship can be handed back at end of the
period use. This would then allow us
to develop and design new vessels
that are bespoke to our needs and
operations - when the time is right.
◀03
Q Is it correct that the
new chartered vessel being A
delivered in 2021 will We are aware of the limitations,
be fitted with two main but we have experience in running
engines? Could this be a vessels with two engines and can
problem on the Calais route? therefore adjust maintenance
schedules to deal with that
challenge accordingly.