Page 2 - Railways
P. 2

RAILWAYS                                                                The excellence of collaboration          www.moniterra.engineering                                                                 RAILWAYS





                                                                                                                              Rail Track position




                                                                                                                              The most important principle of every activity on rails is the
                                                                                                                              accurate measurement of the geometry and absolute position of
                                                                                                                              the track rails.


                                                                                                                              To achieve that goal we chose to use AMBERG GRP FX
                                                                                                                              Systems, since 2008, performing fast and accurate surveying
                                                                                                                              services, leading our clients to deliver in time, high quality results
                                                                                                                              at best value for money costs.

                                                                                                                                                                                                                 Athens Metro rehabilitation
                                                                                                                              This system is equipped with high-end technology sensors to
                                                                                                                              record Cant, Gauge and Chainage. It is getting and correcting its
                                                                                                                              position using the control points with an on board total station or
                                                                                                                              disto-meter and an integrated IMU sensor.


                                                                                                                              A measurement of the geometry and absolute position of the
                                                                                                                              track rails takes place, that can be compared with the design
                                                                                                                              study and allocate any potential deviations between actual
                                                                                                                              situation and theoretical alignment.

                                                                                                                              Furthermore, this measurement will be the reference rail track
                                                                                                                              line for all the following measurements within future maintenance
                                                                                                                              time.
                                                                                                                                                                                                                        Track Geometry

                                                                                                                              Analysis of the recorded inner and outer track geometry,
                                                                                                                              can done using the dedicated software, so that, evaluation,
                                                                                                                              conclusions and actions will follow.


                                                                                                                              Benefits:

                                                                                                                              •    High accuracy (up to < +/- 1.0mm)
                                                                                                                              •    Speed – minimum time presence in track
                                                                                                                              •    Safety – minimum personnel presence in track
                                                                                                                              •    Minimum effect by environmental conditions
                                                                                                                              •    Fully automated recordings
                                                                                                                                                                                                               Athens Metro rehabilitation



              The COMPANY





              The increasing number of high-speed rail links and the demand for high
              standards in travelling comfort and safety, requires to-the-millimeter
              accuracy during track installation and maintenance.

              Moniterra, in order to meet such requirements, applies through Topometria,
              High End Technology and Services, giving to all involved parties the
              advantage to monitor, supervise, manage and construct accordingly.                                                                                                                                 Single CP measurement




            2                                                                                                                                                                                                                      3
   1   2   3   4   5   6   7