Page 6 - Railways
P. 6

RAILWAYS                                                                The excellence of collaboration          www.moniterra.engineering                                                                 RAILWAYS



                                                                                                                              PROJECT: “RENOVATION OF INFRASTRUCTURE – FOUNDATIONS

          Inspection                                           •    The easy comparison of multiple inspection periods        AND SUPPORT OF TUNNEL FROM OMONOIA TO MONASTIRAKI OF
          Intact tunnel structures are necessary to guarantee safe and   •    The accurate results
          economic operation, so what is a precondition to facilitate an   •    The monitoring of damage overtime             THE ATHENS PIRAEUS ELECTRIC RAILWAYS S.A.”
          economical life cycle management is the:
                                                               •    The speed – minimum time presence in track

                                                               •    The safety – minimum personnel presence in track
          •    Inspection of the tunnel on regular time basis, or after an                                                    1. A FEW WORDS ABOUT THE PROJECT:                    network were made with a high precision 3cc geodetic station
              incident                                                                                                        The Athens Piraeus Electric Railways is one of the oldest Greek   for angles and +/- 1mm+2ppm for distances. The polygonal
          •    Acknowledgement and documentation of current tunnel                                                            enterprises in operation (140 years) and its history is interlinked   routings that followed were fully tied to the two ends of the
                                                                                                                                                                                   main horizontal network. The distances between the peaks
              structure condition                                                                                             with the history of Greece over this period.         were approximately 150 m. and less where deemed necessary.
          •    Allocation, classification and monitoring of damages                                                           The first railway was inaugurated in 1869, and, up to 1904, the   Elevation  Network: The primary and secondary elevation
          •    Data Base creation of tunnel’s condition                                                                       Athens-Piraeus line was served by steam engines. After that,   network was  measured using geometric levelling  with the
                                                                                                                              the trains were powered by electricity and the electric railways   required precision. The new elevation network was also
                                                                                                                              were modernized. In the context of this modernization and the   correlated with the existing level benchmarks of the sections
          By using the same mobile mapping method as for envelope                                                             upgrade of the ISAP railways, a renovation of the infrastructure-  on  both  sides  at  the  ends  of  the  Piraeus  to  Kifissia  project
          clearance, dense point cloud data is collected, exporting                                                           foundations, and the support of the Omonoia-Monastiraki   (K.P. 0+050 – K.P. 25+600). With regard to the primary level
          projected high definition images of the tunnel surface.                                                             tunnel started in 2008.                              network, fixed points were established throughout the length
                                                                                                                                                                                   of the entire Piraeus-Kifissia line outside the fencing, so that
          With predefined tunnel structure and geometry of inspectables,                                                      2. OUR CONTRIBUTION TO THE PROJECT:                  they were located outside the project’s zone of influence. The
                                                                                                                                                                                   distance between the established points was approximately
          next step is the digitalization of recognizable damage,                                   Inspection sheet          The implementation of this project required constant surveying  400 meters. The Level Network was measured with digital
          structural features & equipment.                                                                                    support, both before and after the start of construction. Our  levels +/- 1 mm/Km.
                                                                                                                              contribution pertained to both these stages with corresponding   Surveying
                                                                                                                              surveying works each time, for kilometre points from 0+650
          The automatic generation of inspection result overviews is one   EXPERIENCE                                         (Neo Faliro Station) to 26+600 (Kifissia Station), as follows:  The complete surveying of the existing condition of the railway
          of the benefits that this non-conventional method offers. Also                                                                                                           network  (lines,  surrounding  space,  stations,  work  lines,
          to be mentioned:                                                                                                    - DESIGN STUDY PHASE                                 continuous welded rails, technical works, the positions of the
                                                               •   Metro Line Rehabilitation, Athens GREECE                     •   Establishment and resolution of primary and secondary  cable troughs, manholes, existing utilities networks – operating
                                                               •   National Railway Tunnel inspection and maintenance,             horizontal and elevation control network.       systems of ISAP S.A. overhead, electric joints etc.) was
          •    The comprehensive filtering routines for the data export  Ag. Stefanos, GREECE                                   •   Horizontal and elevation surveying of the existing lines   conducted using two methods:
          •    The standardized inspection catalogue vs inspector’s   •   National Railway Tunnel inspection Tempi, GREECE         and the surrounding space, inside and outside the  •   Imaging with geodetic station Trimble S6 High Precision 1’’
              preferences in symbols and textures              •   Railway Construction, Ikonio, GREECE                            tunnel, stations, and work lines.                   (1mm+1ppm).
          •    The Digital Tunnel archive book creation / Data Base   •   National Railway Cargo Station, Athens GREECE         •   Imaging of all survey data in drawings and digital format   The general imaging of the railway network (except for the
                                                                                                                                   (horizontal plans, longitudinal sections, cross-sections).  tunnel), the stations, surrounding space, etc., was mainly
                                                                                                                                                                                       based there.
                                                                                                                                                                                       The already established fixed points of the trigonometrical
                                                                                                                              In more detail,
                                                                                                                                                                                       network were used for tying.
                                                                                                                              Establishment and resolution of primary and secondary   •   Surveying with the GRP 1000 railway track geometry
                                                                                                                              horizontal and elevation control network
                                                                                                                                                                                       control system, on which the detailed imaging of the tracks
                                                                                                                              The points of the two networks were tied to the State    was based, and the GRP 5000 control system, which
                                                                                                                              Trigonometrical Network.                                 consists of the GRP 1000, including a digital Amberg
                                                                                                                                                                                       Laser Scanner 5003. The latter was used especially for
                                                                                                                              Horizontal Network: For the primary horizontal network, two
                                                                                                                              fixed points were established on the exterior of each station,   high precision surveying of points of the perimeter of the
                                                                                                                                                                                       tunnel and its clearance, as well as the drawing of the
                                                                                                                              so that they would not be affected by the construction works.
                                                                                                                              They were positioned at the start and end of each station   cross sections.
                                                                                                                              and they were mutually visible. There was also densification  The use of the GRP 1000-5000 became even more necessary
                                                                                                                              of  fixed  points  between  stations  where  deemed  necessary.  during the project’s construction phase, as will be seen below.
                                                                                                                              The measurements of the primary trigonometrical network of   This system, operated by appropriately trained staff, is the ideal
                                                                                                                              the two peaks of each station were made with GPS and the   instrument for survey works on railway projects, and especially
                                                                                                                              coordinates were entered into the Greek Geodetic Reference   for projects that include such a long length of railway tracks,
                                                                                                                              System (EGSA) 87.
                                                                                                                                                                                   where the need to save time due to the strict deadlines and
                                                                                                                              - The secondary horizontal network was installed and marked  for a quality result are very high. This system was used for this
                                                                                                                              permanently close to the working site. It consisted of points  specific project, supported by geodetic Stations LEICA 1201,
                                                                                                                              of paired mutual visibility, and was connected with the basic  1’’,+/- (2mm+2ppm) , LEICA 2003, 0,5’’, +/- (1mm+1ppm) ,
                                                                                                                              trigonometrical network of the Hellenic Military Geographical  and the Amberg Laser Scanner. The advantages of the GRP
                                                                                                                              Service. The measurements for the secondary horizontal  1000-5000 system are:
                                                                                                 Ikonio cargo station
            6                                                                                                                                                                                                                      7
   1   2   3   4   5   6   7   8   9   10   11