Page 8 - Railways
P. 8

RAILWAYS                                                                The excellence of collaboration          www.moniterra.engineering                                                                 RAILWAYS





          •   Easy transport and installation on railway tracks.  In more detail,                                                with +/- 3mm accuracy and the installation was carried out
                                                                                                                                 by the above machine with the help of workers.
          •   Number of simultaneous information in real time:  Adjustment-tracing of railway tracks with the GRP control
                                                               system.                                                           - Final Adjustment, where now the detailed tracing was
              Horizontal distance from theoretical axis (accuracy +/- 0.1                                                        carried out with +/-0.9mm accuracy, manually and with
              mm)                                                        The tracing of the railway tracks with the GRP included   the appropriate tools for the micro-corrections.
                                                               all types of tracks of the project, with the following order of the
              Elevation distance from theoretical axis (accuracy +/- 0.1
              mm)                                              works:                                                            - Inspection-acceptance (As Built) correspondingly, as
                                                                                                                                 with  the  rails  on  the  ground.  Here,  the  identification  of
              Cant (accuracy +/- 0.5 mm)                                                                                         any theoretical—constructed track deviations was more
                                                               •   Railway tracks on ground and specifically on broken stone.    frequent, since it could not exceed 1 km and the concreting
              Superelevation (accuracy +/- 0.5 mm)
                                                                   - Rough adjustment where as initial phase the lines were      of the mounting of the rails intervened with the subsequent
              Track gauge (accuracy +/- 0.3 mm)                                                                                  micro-movements.
                                                                   traced with +/- 5 mm accuracy, and a special elevation
              Exact kilometre position.                            and rail installation machine was used, which moved along
              Surveying of clearance and surrounding area.         the track and compacted the broken stone.                  •   3.5km railway tracks on a slab inside the “Monastiraki –
                                                                   - Final Adjustment, where tracing was carried out with +/-    Attiki” tunnel.
              Clearance check.
                                                                   1.5mm accuracy, with the help of the same machine.
                                                                                                                                 - The same methodology was followed here as with
                                                                   - Inspection-acceptance (As Built) where measurements         the  foundation  rails  before,  during  the  rough  and  final
          - CONSTRUCTION PHASE                                     of the track were made with the same density as traced,       adjustment and the inspection-acceptance phases.
                                                                   and essentially it was verified that it was installed exactly
          •   Adjustment-tracing of railway tracks with the GRP control                                                          - Their difference, as regards the methodology, with those
              system.                                              on the theoretical axis of the study.                         outside the tunnel, pertains to an interim stage between
                                                                                                                                 rough and final adjustment. After rough adjustment, and
          •   Monitoring of micro-movements at the section of the
              “Monastiraki-Omonoia” railway network.           •   Rails on slab, mounted on fixed concrete foundations.         certainly before the final adjustment, it was necessary to
                                                                                                                                 inspect the tunnel’s clearance in real time.
                                                                   - Rough adjustment where initially the tracks were traced
                                                                                                                                 Due to the small gauge of the tunnel, in width and height,
                                                                                                                                 and therefore the narrow space, this was done in order
                                                                                                                                 to determine with certainty and precision any interference
                                                                                                                                 by any elements (supports, walls, cables, cable shelves,
                                                                                                                                 electromechanical  boxes,  signals,  signs,  etc)  within  the
                                                                                                                                 clearance that was provided for and should exist for the
                                                                                                                                 correct construction of the project.

                                                                                                                                 This inspection was carried out at sections of the line each
                                                                                                                                 time, with the most advanced GRP 5000 control system.


                                                                                                                              Monitoring  of  micro-movements  at  the  section  of  the
                                                                                                                              “Monastiraki-Omonoia” railway network.
                                                                                                                                     The 850m-long (total length 1465 m) section of the ISAP
                                                                                                                              line between Monastiraki – Omonoia, is located inside the old
                                                                                                                              660m tunnel, which was constructed in 1893. Thus, due to
                                                                                                                              the age of the tunnel, one of the project’s objectives was to
                                                                                                                              support it, and therefore to take preventive measures during
                                                                                                                              the progress of the works inside it.
                                                                                                                                     Our surveying support played an instrumental role in this
                                                                                                                              part, and pertained to monitoring the micro-movements inside
                                                                                                                              and outside the tunnel, i.e. underground and above ground.
                                                                                                                              •   Underground:
                                                                                                                                  Monitoring micro-movements included any convergence
                                                                                                                              presented by the tunnel walls. Before measurements started,
                                                                                                                              permanent controls had to be installed, which were targets
                                                                                                                              installed on tie rods embedded in the walls. After installation
                                                                                                                              and before the start of the works, “zero” measurements of the
                                                                                                                              controls were taken, in order to accurately observe their initial
                                                                                                                              position. Then, and simultaneously with the start of the works,
                                                                                                                              measurements were taken on a daily basis and their results
                                                                                                                              were sent directly to the construction company.