Page 5 - IchorTMSCatalog
P. 5

TMS Panel Assembly:

          TMS panels are easy for an operator to assemble, no matter what type of sealing interface is being
          employed. The steps are straightforward:


          1     Cradles are mounted to a base plate, using cradle bolt hardware.


                Inserts are added, either as individual pieces or as weldments. Weldments include TMS
          2
                manifold inserts as well as the many available face seal and weld fi ttings that Ichor off ers.

          3     TMX C-Seals are placed on top, as well as any sandwich components and fl anges.

                Finally, top mount components are bolted onto the cradles using component bolt hardware.
                Ichor off ers a wide variety of valves with its Modular Diaphragm Valve and Modular Metering
          4
                Valve product lines as well as a full selection of Surface Mount Accessories. Heaters may easily
                be integrated into the panel assembly.



















        Specifi cations





          Operating Temperature:                                  Max Operation Pressure:


            390°F (200°C)                                          4500 PSI (31 MPa)



          Disclaimer*    Customer must ensure parts chosen are appropriate components for their safe performance, taking into
                         account material compatibility, operating conditions, proper installation, etc. of gas/fl uid delivery system.

                         *For full disclaimer and warranty please see page 20



          Testing        Every Ichor wetted component is leak-checked across all welds in accordance with SEMI F1.





                                                                           TMS: Talon Modular Integrated Gas Systems     |     PAGE 5
   1   2   3   4   5   6   7   8   9   10